WELL · 42-057-31549 · DISTRICT 2

E. H Welder #56

Plugged

Calhoun County · Heyser S. (5400 #1) field  · Vertical

E. H Welder #56 (API 42-057-31549) is a plugged well in Calhoun County, plugged June 21, 2022, last operated by B&L Resources L.L.C..

The RRC has issued 2 drilling permits (amended once) between 1996 and 1998, permitted to 6,700 ft.

It was permitted by Unit Petroleum Company and has since transferred to B&L Resources L.L.C. on the wellbore schedule.

Completion filings report 11 formation tops, including Greta, 5400 # 1, 5400 #1, 5400 #1 Sd..

Its 3 leases have reported 12.7K barrels of oil and 244K mcf of gas since February 1997, last reporting in August 2022. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

B&L Resources L.L.C.

Permitted by Unit Petroleum Company; the EWA schedule now lists a different operator.

Metairie, LA · P-5 Y, filed Sep 4, 2025 · 6 permits on file · (504) 837-4337

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleB&L Resources L.L.C.
Production reportsXOG Operating LLCthrough Mar 2016
Latest permitUnit Petroleum CompanyJun 4, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,700
total depth, ft
3
permits on file
Jun 4, 1998
last permit issued
Sep 29, 2010
completed
12.7K
cumulative oil, bbl
244K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1997 THROUGH Aug 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 29, 2010
Shut in
—
Plugged
Jun 21, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
E. H Welder O-2-9662Heyser, S. (5400 #1)B&L Resources, L.L.C.12780Sep 2010 – Aug 2022
Welder, Mrs. E. H. G-2-169251Heyser, S. (5400 #1)XOG Operating LLC10174KMar 1998 – Jan 2012
Welder, Mrs. E. H. O-2-8310Heyser (5400 #1)Unit Petroleum Company112.5K69.7KFeb 1997 – Sep 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Unit Petroleum CompanyFeb 1997 → Mar 2001
  2. 2XOG Operating LLCJan 2006 → Mar 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
476679-99Field transferUnit Petroleum CompanyMay 28, 1998Jun 4, 1998Dec 17, 19966,611
453686-98DrillUnit Petroleum CompanyOct 24, 1997Oct 10, 1996—6,611
453686-99DrillUnit Petroleum CompanyOct 10, 1996Oct 10, 1996Dec 15, 19966,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-169251————
—— O-2-8310————
—— O-2-9662————

Formation tops

As filed on W-2/G-1. Subsea from 56 ft elevation.Download CSV →

FormationMD ftSubsea
Greta4,973-4,917
5400 # 15,583-5,527
5400 #15,583-5,527
5400 #1 Sd.5,583-5,527
5400 # 25,633-5,577
5400 #25,633-5,577
5400 #2 Sd.5,633-5,577
5400 # 35,696-5,640
5400 #35,696-5,640
5400 #3 Sd.5,696-5,640
Larosa6,268-6,212

Perforations

Perforated and open-hole intervals.

FromToType
5,5895,597Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,58412.25720 S
4.55,9217.875630 S
4.55,9347.875630 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 14, 2011Jan 25, 2011—
00Oct 29, 1998Mar 11, 1998—
00Oct 28, 1998Mar 11, 1998—
00Aug 11, 1998——
00Jan 5, 1998Mar 7, 1997Yes
00Nov 25, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05731549, documented in the API reference.