WELL · 42-057-31565 · DISTRICT 2

State Tract 77 #1

N

Calhoun County  · Directional

State Tract 77 #1 (API 42-057-31565) is a permitted well in Calhoun County filed by Rincon Petroleum Corporation; no completion report is on file yet.

The RRC has issued 3 drilling permits (amended once) between 1997 and 2011, permitted to 8,900 ft.

Its 5 leases have reported 44.8K barrels of oil and 989K mcf of gas since October 1997, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Rincon Petroleum Corporation

Corpus Chrsti, TX · P-5 Y, filed Apr 4, 2026 · 259 permits on file · (361) 960-9033

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsSilverbrook Operating, LLCthrough Apr 2026
Latest permitRincon Petroleum CorporationJan 26, 2011
8,900
total depth, ft
4
permits on file
Jan 26, 2011
last permit issued
—
completed
44.8K
cumulative oil, bbl
989K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
State Tract 77 G-2-255118Maude B. Traylor (7700)Rincon Petroleum Corporation1053.2KOct 2009 – Jul 2026
State Tract 77 O-2-9483Maude B. Traylor (Freda)Silverbrook Operating, LLC117.4K0Oct 2010 – Jul 2026
State Tract No. 77 O-2-8660Olivia, South (8300)Rincon Petroleum Corporation127.4K158KJun 2001 – Apr 2010
State Tract No. 77 G-2-169728Olivia, South (8300)Esenjay Exploration, Inc10778KOct 1997 – Oct 2001
State Tract No. 77 O-2-8659Olivia (8300)Esenjay Exploration, Inc100Jun 2001 – Oct 2001

Oil, barrels lease total

Last 12 months 485 · prior 12 491(-1%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Esenjay Exploration, IncOct 1997 → Aug 2002
  2. 2Rincon Petroleum CorporationSep 2002 → Feb 2024
  3. 3Silverbrook Operating, LLCMar 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
708977-99RecompletionRincon Petroleum CorporationJan 21, 2011Jan 26, 2011Oct 22, 20108,604
685368-98RecompletionRincon Petroleum CorporationNov 1, 2010Oct 8, 2009Oct 9, 20098,604
685368-99RecompletionRincon Petroleum CorporationSep 22, 2009Oct 8, 2009Oct 9, 20098,604
465930-99DrillEsenjay Petroleum Corp.Aug 7, 1997Aug 19, 1997Oct 18, 19978,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-169728————
—— G-2-255118————
—— O-2-8659————
—— O-2-8660————
—— O-2-9483————

Perforations

Perforated and open-hole intervals.

FromToType
8,0918,094Perforated
8,3358,340Perforated
8,7508,757Perforated
8,9548,970Perforated
8,9748,977Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,00013.5330 S
5.59,4728.75990 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 9, 2011Nov 23, 2010Yes
00Jan 21, 2011——
00Jul 19, 2010Oct 23, 2009Yes
00Mar 24, 2010——
00Nov 14, 2001Aug 27, 2001Yes
00Oct 11, 2001——
00Oct 10, 2001——
00Oct 29, 1998Feb 26, 1998Yes
00Sep 11, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease