WELL · 42-057-31706 · DISTRICT 2

Gallinipper Unit #2801

Plugged

Calhoun County · Lavaca Bay (F-43) field  · Vertical

Gallinipper Unit #2801 (API 42-057-31706) is a plugged well in Calhoun County, plugged July 19, 2018, last operated by Neumin Production Company.

The RRC has issued 2 drilling permits (amended once) between 2005 and 2011, permitted to 13,000 ft.

Completion filings report 7 formation tops, including Em Marker, F-25, Lavaca Bay (F-38), Lavaca Bay (F38).

Its 3 leases have reported 47.2K barrels of oil and 1.92M mcf of gas since June 2006, last reporting in July 2018. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Neumin Production Company

Point Comfort, TX · P-5 Y, filed May 4, 2026 · 380 permits on file · (361) 987-8948

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNeumin Production Company
Production reportsNeumin Production Companythrough Aug 2017
Latest permitNeumin Production CompanyOct 31, 2011
13,000
total depth, ft
3
permits on file
Oct 31, 2011
last permit issued
Feb 23, 2006
completed
47.2K
cumulative oil, bbl
1.92M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2006 THROUGH Jul 2018

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 23, 2006
Shut in
—
Plugged
Jul 19, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gallinipper Unit G-2-263990Lavaca Bay (F-39)Neumin Production Company10365KJan 2011 – Jul 2018
Gallinipper Unit G-2-238049Lavaca Bay (F-43)Neumin Production Company10233KJul 2008 – Jan 2012
Gallinipper Unit O-2-9164Lavaca Bay (F-43)Neumin Production Company247.2K1.32MJun 2006 – Sep 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Neumin Production CompanyDec 2007 → Aug 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
726373-99RecompletionNeumin Production CompanyOct 17, 2011Oct 31, 2011Jan 6, 201112,000
605896-98DrillNeumin Production CompanyFeb 27, 2006Sep 6, 2005Nov 8, 200513,000
605896-99DrillNeumin Production CompanySep 6, 2005Sep 6, 2005Nov 8, 200513,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-238049————
—— G-2-263990————
—— O-2-9164————
—— O-2-9164————

Formation tops

As filed on W-2/G-1. Subsea from 32 ft elevation.Download CSV →

FormationMD ftSubsea
EM Marker9,200-9,168
F-259,660-9,628
Lavaca Bay (F-38)10,620-10,588
Lavaca Bay (F38)10,656-10,624
Tex Miss11,000-10,968
Lavaca Bay (F-43)11,020-10,988
Lavaca Bay (F43)11,104-11,072

Perforations

Perforated and open-hole intervals.

FromToType
10,61610,626Perforated
10,63810,644Perforated
11,03611,044Perforated
11,88811,893Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,2006.75450 S
10.752,87413.51,190 S
10.752,87713.51,190 S
7.6257,1619.625925 S
7.6259,1619.625925 S
4.512,0006.75450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 27, 2012Nov 4, 2011—
00Oct 2, 2008Aug 13, 2008—
00Sep 29, 2008Oct 1, 2007Yes
00Aug 22, 2008——
00Feb 28, 2008Oct 12, 2006Yes
00Feb 7, 2008——
00Jan 15, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05731706, documented in the API reference.