WELL · 42-057-31799 · DISTRICT 2
Bull Redfish Unit #6
Calhoun County · Panther Reef (Frio Cons.) field · Producing · Directional
Bull Redfish Unit #6 (API 42-057-31799) is a well in Calhoun County operated by Lamar Oil & Gas Inc., completed July 24, 2015 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended 3 times), issued July 9, 2014, permitted to 11,000 ft.
It was permitted by Magnum Operating, LLC and has since transferred to Lamar Oil & Gas Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Frio, Catahoula.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Magnum Operating, LLC; the EWA schedule now lists a different operator.
Corpus Christ, TX · P-5 Y, filed Sep 4, 2025 · 46 permits on file · (405) 708-4768
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lamar Oil & Gas Inc. |
| Production reports | Lamar Oil & Gas, Inc.through May 2025 |
| Latest permit | Magnum Operating, LLCJul 9, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,000
- total depth, ft
- 4
- permits on file
- Jul 9, 2014
- last permit issued
- Jul 24, 2015
- completed
- 0
- cumulative oil, bbl
- 21.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2016 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 24, 2015
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
28.269002, -96.699029
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Calhoun County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| 'Bull Redfish' Unit G-2-283708 | Panther Reef (Frio Cons.) | Lamar Oil & Gas, Inc. | 1 | 0 | 21.2K | Apr 2016 – Jul 2026 |
Gas, mcf lease total
Last 12 months 985 · prior 12 3,336(-70%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lamar Oil & Gas, Inc.Sep 2021 → May 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 789228-95 | Drill | Magnum Operating, LLC | Jul 20, 2018 | Jul 9, 2014 | Aug 27, 2014 | 11,000 |
| 789228-97 | Drill | Magnum Operating, LLC | Oct 26, 2015 | Jul 9, 2014 | Aug 27, 2014 | 11,000 |
| 789228-98 | Drill | Magnum Operating, LLC | Jul 25, 2014 | Jul 9, 2014 | — | 11,000 |
| 789228-99 | Drill | Magnum Operating, LLC | Jun 11, 2014 | Jul 9, 2014 | Aug 28, 2014 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-283708 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,236 | 9,264 | Perforated |
| 9,286 | 9,301 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,516 | 14.75 | 2,870 S |
| 7.625 | 8,105 | 9.875 | 350 S |
| 4.5 | 10,300 | 6.75 | 885 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 16, 2018 | Nov 10, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-057-31799 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-057-31799 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05731799, documented in the API reference.