WELL · 42-059-04186 · DISTRICT 7
Heyser Naomi #1210
Callahan County · A. C. Scott NW. (Cross Plains) field · Vertical
Heyser Naomi #1210 (API 42-059-04186) is a plugged well in Callahan County, plugged April 22, 2013, last operated by Operator P-5 Not On File.
The RRC has issued one drilling permit, issued October 9, 2006, permitted to 1,891 ft.
It was permitted by Quail Well Service, Inc. and has since transferred to Operator P-5 Not On File on the wellbore schedule.
Completion filings report 3 formation tops, including Home Creek, Winchell, Cross Plains.
Its lease has reported 285 barrels of oil since March 2007, last reporting in August 2019.
Operator of record
Permitted by Quail Well Service, Inc.; the EWA schedule now lists a different operator.
Austin, TX · P-5 New
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Operator P-5 Not on File |
| Production reports | Quail Well Service, Inc.through Dec 2009 |
| Latest permit | Quail Well Service, Inc.Oct 9, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,891
- total depth, ft
- 1
- permits on file
- Oct 9, 2006
- last permit issued
- —
- completed
- 285
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2007 THROUGH Aug 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Apr 22, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Snyder O-8-30013 | A. C. Scott (Cross Plains) | Quail Well Service, Inc. | 1 | 285 | 0 | Mar 2007 – Aug 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Quail Well Service, Inc.Oct 2007 → Dec 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 627185-99 | Reenter | Quail Well Service, Inc. | Oct 9, 2006 | Oct 9, 2006 | Dec 18, 2006 | 1,891 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-30013 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,732 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Home Creek | 1,420 | 312 |
| Winchell | 1,620 | 112 |
| Cross Plains | 1,842 | -110 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,844 | 1,849 | Perforated |
| 1,858 | 1,862 | Perforated |
| — | 1,843 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 60 | 12.25 | 50 S |
| 10.75 | 60 | — | — |
| 4.5 | 1,880 | 8.75 | 100 S |
| 7 | 1,885 | — | — |
| 7 | 1,889 | 8.75 | 50 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 9, 2008 | Oct 12, 2007 | Yes |
| 00 | May 22, 2008 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-04186 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-04186 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05904186, documented in the API reference.