WELL · 42-059-31308 · DISTRICT 7

Finley 75 #1A

Plugged

Callahan County · Putnam West (Duffer) field  · Vertical

Finley 75 #1A (API 42-059-31308) is a plugged well in Callahan County, plugged June 26, 1998, last operated by Crown Exploration Company.

The RRC has issued 2 drilling permits between 1977 and 1995, permitted to 4,250 ft.

It was permitted by Charter Petroleum Company and has since transferred to Crown Exploration Company on the wellbore schedule.

Completion filings report 8 formation tops, including Moutray Sand, Palo Pinto, B/Palo Pinto, Capps Lime.

Operator of record

Crown Exploration Company

Permitted by Charter Petroleum Company; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Dec 2, 1995 · 135 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCrown Exploration Company
Production reportsCharter Petroleum Companythrough Jun 1998
Latest permitCharter Petroleum CompanyMar 13, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,250
total depth, ft
2
permits on file
Mar 13, 1995
last permit issued
Feb 17, 1977
completed
0
cumulative oil, bbl
58K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 17, 1977
Shut in
—
Plugged
Jun 26, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Finley 75 G-8-153497Callahan County Regular (Gas)Charter Petroleum Company1041.1KMar 1995 – Jun 1998
Finley 75 G-8-122636Putnam, West (Duffer)Charter Petroleum Company1016.9KJan 1993 – Mar 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Charter Petroleum CompanyJan 1993 → Jun 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
433678-99RecompletionCharter Petroleum CompanyMar 10, 1995Mar 13, 1995Feb 10, 1995618
7460-99DrillCrown Exploration CompanySep 13, 1977Sep 13, 1977—4,250

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-122636————
—— G-8-153497————

Formation tops

As filed on W-2/G-1. Subsea from 1,578 ft elevation.Download CSV →

FormationMD ftSubsea
Moutray Sand3911,187
Palo PintoBASE PALO PINTO2,219-641
B/Palo Pinto2,219-641
Palo Pinto2,219-641
Capps Lime2,436-858
Caddo3,423-1,845
Duffer3,898-2,320
Barnett3,973-2,395
Ellenburger4,103-2,525

Perforations

Perforated and open-hole intervals.

FromToType
398404Perforated
3,8983,929Perforated
3,898—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522411140 S
4.56097.875150 S
2.3753,955——
4.54,0077.875215 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 11, 1995Mar 17, 1995Yes
00Apr 4, 1995——
00Dec 4, 1986Nov 24, 1986—
00Dec 2, 1986——
00May 23, 1986Sep 16, 1985—
00Oct 18, 1985Sep 16, 1985—
00Sep 25, 1985——
00Jan 12, 1984Jul 21, 1982—
00Jan 12, 1984Sep 9, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05931308, documented in the API reference.