WELL · 42-059-31874 · DISTRICT 7
Harville Tina #1
Callahan County · St. Anthony (Gray) field · Vertical
Harville Tina #1 (API 42-059-31874) is a plugged well in Callahan County, plugged February 12, 1996, last operated by Encon Services Inc..
The RRC has issued one drilling permit (amended once), issued November 23, 1977, permitted to 4,700 ft.
Completion filings report 2 formation tops, including Fry, Gray.
Its lease has reported 161 barrels of oil and 512 mcf of gas since January 1993, last reporting in March 1996. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Abilene, TX · P-5 Y, filed Dec 9, 2011 · 93 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Encon Services Inc. |
| Production reports | Dallas Production, Inc.through Sep 1993 |
| Latest permit | Olsen, Fred. Inc.Nov 23, 1977 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,700
- total depth, ft
- 2
- permits on file
- Nov 23, 1977
- last permit issued
- Feb 13, 1978
- completed
- 161
- cumulative oil, bbl
- 512
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 13, 1978
- Shut in
- —
- Plugged
- Feb 12, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Harville, T. B O-8-24575 | Grand Old Oplin (Gray) | Dallas Production, Inc. | 2 | 161 | 512 | Jan 1993 – Mar 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dallas Production, Inc.Jan 1993 → Sep 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 13179-98 | Field transfer | Encon Services, Inc. | Dec 9, 1988 | Nov 23, 1977 | — | 4,700 |
| 13179-99 | Drill | Olsen, Fred. Inc. | Nov 23, 1977 | Nov 23, 1977 | — | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-24575 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,020 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Fry | 3,770 | -1,750 |
| Gray | 3,926 | -1,906 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,926 | 3,934 | Perforated |
| 3,926 | 3,955 | Perforated |
| 3,938 | 3,942 | Perforated |
| 3,951 | 3,955 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 181 | 11 | 110 S |
| 2.375 | 3,903 | — | — |
| 4.5 | 4,066 | 7.875 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 7, 1989 | Dec 19, 1988 | — |
| 00 | Feb 1, 1989 | Jun 19, 1978 | — |
| 00 | Dec 30, 1988 | — | — |
| 00 | Jan 12, 1984 | Jun 19, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-31874 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-31874 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05931874, documented in the API reference.