WELL · 42-059-32468 · DISTRICT 7

Guitar Earl #1

N

Callahan County · Wildcat field  · Vertical

Guitar Earl #1 (API 42-059-32468) is a disposal or injection well in Callahan County operated by Martin Oil CO. under an active UIC permit.

The RRC has issued 2 drilling permits between 1979 and 1995, permitted to 4,600 ft.

Completion filings report 5 formation tops, including Moran, Goen, Goen L. S., Gardner.

Its 2 leases have reported 4.3K barrels of oil and 62.6K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 209K barrels injected in the 12 months reported through February 2026.

Operator of record

Martin Oil Co.

Aspermont, TX · P-5 Y, filed Apr 3, 1998 · 77 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMartin Oil Co.
Production reportsLime Creek Enterprisesthrough Sep 2006
Latest permitMartin Oil Co.Mar 8, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,600
total depth, ft
2
permits on file
Mar 8, 1995
last permit issued
—
completed
4.3K
cumulative oil, bbl
62.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Guitar O-8-17543Callahan County RegularGrayrock Energy II, LLC24.3K62.6KJan 1993 – Jul 2026
Guitar, Earl O-8-26238WildcatMartin Oil Co.100Jan 1993 – Aug 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Martin Oil Co.Jan 1993 → Apr 1996
  2. 2Lime Creek EnterprisesSep 1996 → Mar 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
433536-99Field transferMartin Oil Co.Mar 6, 1995Mar 8, 1995Dec 3, 19793,860
64954-99DrillMartin Oil Co.Nov 29, 1979Nov 29, 1979Dec 2, 19794,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-17543————
—— O-8-26238————

Formation tops

As filed on W-2/G-1. Subsea from 1,856 ft elevation.Download CSV →

FormationMD ftSubsea
Moran3,368-1,512
Goen3,654-1,798
Goen L. S.3,654-1,798
Gardner3,798-1,942
Gardner Sand3,798-1,942

Perforations

Perforated and open-hole intervals.

FromToType
3,7983,820Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516412.25120 S
5.53,8467.875360 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 6, 2021Sep 7, 2021—
00Jan 11, 1996Sep 11, 1995—
00Nov 3, 1995—Yes
00Jul 9, 1991Jun 12, 1991Yes
00Jul 8, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

209K
bbl, last 12 reported months
2.9M
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082980H-1 InjectionActive1,0001,0003,168–3,820

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 208,852 · prior 12 217,805(-4%)

010K20K30K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05932468, documented in the API reference.