WELL · 42-059-32619 · DISTRICT 7

Wolfe #1

Plugged

Callahan County · Nicholas (Duffer) field  · Vertical

Wolfe #1 (API 42-059-32619) is a plugged well in Callahan County, plugged October 5, 2011, last operated by Eastland Operating L.L.C..

The RRC has issued one drilling permit, issued March 27, 1980, permitted to 4,200 ft.

It was permitted by P & R Oil, Inc. and has since transferred to Eastland Operating L.L.C. on the wellbore schedule.

Completion filings report 4 formation tops, including Caddo, Marble Falls, Duffer, Ellenbury.

Its lease has reported 9.24K barrels of oil and 200K mcf of gas since January 1993, last reporting in January 2024. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Eastland Operating L.L.C.

Permitted by P & R Oil, Inc.; the EWA schedule now lists a different operator.

Ranger, TX · P-5 Y, filed Oct 4, 2025 · 3 permits on file · (254) 631-5663

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEastland Operating L.L.C.
Production reportsEastland Operating, L.L.C.through Jun 2023
Latest permitP & R Oil, Inc.Mar 27, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,200
total depth, ft
1
permits on file
Mar 27, 1980
last permit issued
Jun 6, 1990
completed
9.24K
cumulative oil, bbl
200K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 6, 1990
Shut in
—
Plugged
Oct 5, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wolfe O-8-16434Nicholas (Duffer)Eastland Operating, L.L.C.29.24K200KJan 1993 – Jan 2024

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Patterson Oil Company, TheJan 1993 → Jan 1998
  2. 2Gaylyn, Inc.Feb 1998 → Dec 2015
  3. 3Eastland Operating, L.L.C.Jan 2016 → Apr 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
76443-99DrillP & R Oil, Inc.Mar 27, 1980Mar 27, 1980Jun 4, 19804,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-16434————

Formation tops

As filed on W-2/G-1. Subsea from 1,774 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo2,624-850
Marble Falls3,530-1,756
Duffer3,576-1,802
Ellenbury3,750-1,976

Perforations

Perforated and open-hole intervals.

FromToType
3,5803,584Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512412.25265 S
2.3753,498——
4.53,6338.625230 S
4.1253,6337.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 27, 1990Jul 2, 1990—
00Jan 12, 1984Apr 18, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
104K
bbl, all reported
Jan 2012
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000072751H-1 InjectionPlugged May 31, 2012402503,580–3,584

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120112012

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05932619, documented in the API reference.