WELL · 42-059-32806 · DISTRICT 7
Eula Davis #2
Callahan County · Callahan County Regular (Gas) field · Vertical
Eula Davis #2 (API 42-059-32806) is a plugged well in Callahan County, plugged August 5, 2003, last operated by Harris Billy D..
The RRC has issued one drilling permit, issued September 10, 1980, permitted to 4,600 ft.
It was permitted by Lewis Production CO., Inc. and has since transferred to Harris Billy D. on the wellbore schedule.
Operator of record
Permitted by Lewis Production Co., Inc.; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Feb 8, 2008
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Harris Billy D. |
| Production reports | none |
| Latest permit | Lewis Production Co., Inc.Sep 10, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,600
- total depth, ft
- 1
- permits on file
- Sep 10, 1980
- last permit issued
- Jun 17, 1981
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 17, 1981
- Shut in
- —
- Plugged
- Aug 5, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Eula, Davis G-8-90133 | Callahan County Regular (Gas) | Harris, Billy D. | 1 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 92078-99 | Drill | Lewis Production Co., Inc. | Sep 10, 1980 | Sep 10, 1980 | — | 4,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-90133 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,533 | 4,536 | Perforated |
| 4,533 | 4,554 | Perforated |
| 4,539 | 4,541 | Perforated |
| 4,543 | 4,548 | Perforated |
| 4,552 | 4,554 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 122 | 11 | 110 sx |
| 2.375 | 4,446 | — | — |
| 4.5 | 4,625 | 7.875 | 125 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 21, 1984 | Jun 19, 1981 | — |
| 00 | Jan 12, 1984 | Jun 19, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-32806 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-32806 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 30.4K
- bbl, all reported
- Jan 1996
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000040190 | H-1 Injection | Plugged Aug 7, 2003 | 50 | 1,000 | 4,533–4,554 |
MONTHLY INJECTED, BBL · H-10 · LAST 21 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05932806, documented in the API reference.