WELL · 42-059-33223 · DISTRICT 7

Johnson et AL #1

Plugged

Callahan County · Callahan County Regular field  · Vertical

Johnson ET AL #1 (API 42-059-33223) is a plugged well in Callahan County, plugged April 14, 1992, last operated by Schkade Bros. Operating Company.

The RRC has issued one drilling permit, issued July 20, 1981, permitted to 4,350 ft.

Completion filings report 3 formation tops, including Winchell Lm, Palo Pinto, Caddo.

Operator of record

Schkade Bros. Operating Company

Abilene, TX · P-5 Inactive, filed Sep 21, 2021 · 184 permits on file · (325) 673-6767

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSchkade Bros. Operating Company
Production reportsnone
Latest permitSchkade Bros. Operating CompanyJul 20, 1981
4,350
total depth, ft
1
permits on file
Jul 20, 1981
last permit issued
Aug 1, 1983
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 1, 1983
Shut in
—
Plugged
Apr 14, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— O-8-23606——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
125816-99DrillSchkade Bros. Operating CompanyJul 20, 1981Jul 20, 1981Jul 24, 19814,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-23606————

Formation tops

As filed on W-2/G-1. Subsea from 1,967 ft elevation.Download CSV →

FormationMD ftSubsea
Winchell LM2,310-343
Palo PintoPALO PINTO LM2,630-663
Caddo3,630-1,663

Perforations

Perforated and open-hole intervals.

FromToType
3,7753,925Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251111170 S
4.53,7767.87590 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 28, 1986Nov 5, 1985—
00Apr 9, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

605
bbl, last 12 reported months
1.11K
bbl, all reported
Apr 1992
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000060201W-14 DisposalPlugged Apr 22, 1992000–3,925

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 605 · prior 12 505(+20%)

05010015019911992

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05933223, documented in the API reference.