WELL · 42-059-33551 · DISTRICT 7

Ross H.W. #3

Plugged

Callahan County · Callahan County Regular field  · Vertical

Ross H.W. #3 (API 42-059-33551) is a plugged well in Callahan County, plugged August 28, 1989, last operated by Tracker Mineral.

The RRC has issued 2 drilling permits between 1982 and 1985, permitted to 5,000 ft.

It was permitted by Santa Anna Energy, Inc. and has since transferred to Tracker Mineral on the wellbore schedule.

Completion filings report 2 formation tops, including Caddo, Ellenburger.

Operator of record

Tracker Mineral

Permitted by Santa Anna Energy, Inc.; the EWA schedule now lists a different operator.

Clyde, TX · P-5 Y, filed Aug 4, 2025 · 127 permits on file · (325) 668-6920

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTracker Mineral
Production reportsnone
Latest permitSanta Anna Energy, Inc.Jul 5, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
2
permits on file
Jul 5, 1985
last permit issued
Aug 14, 1985
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 14, 1985
Shut in
—
Plugged
Aug 28, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
279489-99RecompletionSanta Anna Energy, Inc.Jul 1, 1985Jul 5, 1985—4,800
148267-99DrillSioux Natural Gas CorporationJan 22, 1982Jan 22, 1982Feb 9, 19825,000

Formation tops

As filed on W-2/G-1. Subsea from 1,806 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo3,876-2,070
Ellenburger4,410-2,604

Perforations

Perforated and open-hole intervals.

FromToType
4,4074,424Perforated
4,4964,540Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512011100 S
2.3754,419——
4.54,4367.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 21, 1989Apr 16, 1986—
00Mar 9, 1989——
00Apr 28, 1986Apr 16, 1986—
00Jan 12, 1984Jun 14, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

8K
bbl, last 12 reported months
8K
bbl, all reported
Apr 1989
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000058250W-14 DisposalPlugged Sep 14, 19895001,5003,900–4,000

MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS

Last 12 months 8,000

05K10K

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05933551, documented in the API reference.