WELL · 42-059-33717 · DISTRICT 7

McIntyre Paul #2

Plugged

Callahan County · Callahan County Regular field  · Vertical

Mcintyre Paul #2 (API 42-059-33717) is a plugged well in Callahan County, plugged May 12, 1992, last operated by Miller Bob I..

The RRC has issued one drilling permit, issued April 22, 1982, permitted to 2,500 ft.

Completion filings report one formation top, including Cross Plains.

Operator of record

Miller Bob I.

Abilene, TX · P-5 Y, filed May 2, 2008 · 55 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMiller Bob I.
Production reportsnone
Latest permitMiller, Bob I.Apr 22, 1982
2,500
total depth, ft
1
permits on file
Apr 22, 1982
last permit issued
Jan 2, 1986
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 2, 1986
Shut in
—
Plugged
May 12, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— O-8-18208——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
157686-99DrillMiller, Bob I.Apr 22, 1982Apr 22, 1982—2,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-18208————

Formation tops

As filed on W-2/G-1. Subsea from 1,886 ft elevation.Download CSV →

FormationMD ftSubsea
Cross Plains2,342-456

Perforations

Perforated and open-hole intervals.

FromToType
2,3422,354Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510012.25100 S
4.52,3747.875125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 3, 1986Feb 21, 1986—
00Apr 1, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

5.45K
bbl, last 12 reported months
5.45K
bbl, all reported
Apr 1991
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000057261H-1 InjectionPlugged Jun 18, 19922508002,342–2,354

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 5,450

02004006001991

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05933717, documented in the API reference.