WELL · 42-059-34167 · DISTRICT 7

Kennard Mabel #5

Plugged

Callahan County · Callahan County Regular field  · Vertical

Kennard Mabel #5 (API 42-059-34167) is a plugged well in Callahan County, plugged November 9, 2015, last operated by C & C Petroleum Management LLC.

The RRC has issued one drilling permit, issued April 26, 1983, permitted to 1,600 ft.

It was permitted by Duke, M. L. and has since transferred to C & C Petroleum Management LLC on the wellbore schedule.

Completion filings report one formation top, including Tannehill.

Its lease has reported 24K barrels of oil and 86 mcf of gas since January 1993, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

C & C Petroleum Management LLC

Permitted by Duke, M. L.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Feb 4, 2026 · 6 permits on file · (504) 451-3165

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleC & C Petroleum Management LLC
Production reportsC & C Petroleum Management, LLCthrough May 2013
Latest permitDuke, M. L.Apr 26, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,600
total depth, ft
1
permits on file
Apr 26, 1983
last permit issued
May 17, 1990
completed
24K
cumulative oil, bbl
86
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 17, 1990
Shut in
—
Plugged
Nov 9, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kennard, Mabel O-8-9642Callahan County RegularC & C Petroleum Management, LLC1024K86Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Reliance TrustsJan 1993 → Apr 1994
  2. 2Tokata OilMay 1994 → Dec 1995
  3. 3Peden PropertiesJan 1996 → Sep 1998
  4. 4Neatherlin, Earl Inc.Nov 1998 → Jan 1999
  5. 5American EnergyFeb 1999 → Apr 2003
  6. 6Abtex Energy, Inc.May 2003 → May 2006
  7. 7Tollett OilJun 2006 → Jul 2006
  8. 8Ohlhausen Oil CompanyAug 2006 → Mar 2009
  9. 9Karico GP, LLCApr 2009 → May 2011
  10. 10C & C Petroleum Management, LLCJun 2011 → May 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
192539-99DrillDuke, M. L.Apr 26, 1983Apr 26, 1983Nov 8, 19831,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-9642————

Formation tops

As filed on W-2/G-1. Subsea from 1,936 ft elevation.Download CSV →

FormationMD ftSubsea
TannehillTANNEHILL SAND1,522414

Perforations

Perforated and open-hole intervals.

FromToType
1,5221,530Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510611.7575 S
4.51,5847.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 19, 1990May 24, 1990—
00Feb 27, 1984Jan 6, 1984—
00Feb 15, 1984Jan 6, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
508K
bbl, all reported
Feb 2013
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000056651H-1 InjectionPlugged Dec 1, 2015001,515–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120122013

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05934167, documented in the API reference.