WELL · 42-059-34552 · DISTRICT 7
Orrell A.W. #3 W
Callahan County · Callahan County Regular field · Vertical
Orrell A.W. #3 W (API 42-059-34552) is a plugged well in Callahan County, plugged December 3, 2001, last operated by Atlas Energy Corporation (Del.).
The RRC has issued one drilling permit, issued September 13, 1983, permitted to 1,800 ft.
It was permitted by Rainbow Petroleum, Inc. and has since transferred to Atlas Energy Corporation (Del.) on the wellbore schedule.
Completion filings report one formation top, including Cross Plains Sand.
Operator of record
Atlas Energy Corporation (Del.)
Permitted by Rainbow Petroleum, Inc.; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Oct 7, 2016
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Atlas Energy Corporation (Del.) |
| Production reports | none |
| Latest permit | Rainbow Petroleum, Inc.Sep 13, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,800
- total depth, ft
- 1
- permits on file
- Sep 13, 1983
- last permit issued
- Jan 11, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 11, 1984
- Shut in
- —
- Plugged
- Dec 3, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Orrell, A.W. O-8-20782 | Callahan County Regular | Atlas Energy Corporation (Del.) | 2 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 211478-99 | Drill | Rainbow Petroleum, Inc. | Aug 30, 1983 | Sep 13, 1983 | — | 1,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-20782 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,710 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cross Plains Sand | 1,547 | 163 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,547 | 1,553 | Perforated |
| 1,557 | 1,566 | Perforated |
| 1,571 | 1,583 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 110 | 11 | 100 S |
| 5.5 | 1,629 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 19, 1984 | Feb 7, 1984 | — |
| 00 | Mar 7, 1984 | Feb 7, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-34552 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-34552 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Apr 1993
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000051903 | H-1 Injection | Plugged Dec 31, 2001 | 200 | 700 | 1,550–1,650 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05934552, documented in the API reference.