WELL · 42-059-34790 · DISTRICT 7
George 63 #1
Callahan County · Putnam NW. (Tannehill) field · Vertical
George 63 #1 (API 42-059-34790) is a plugged well in Callahan County, plugged June 25, 1987, last operated by Jones CO..
The RRC has issued 2 drilling permits between 1984 and 1986, permitted to 4,400 ft.
Completion filings report 8 formation tops, including B/Dothan, Camp Colorado, Stockwether, Tannehill.
Operator of record
Albany, TX · P-5 Inactive, filed Apr 26, 1990 · 779 permits on file · (325) 762-3353
SOURCE · RRC EWA WELLBORE SCHEDULE
- 4,400
- total depth, ft
- 2
- permits on file
- Jan 14, 1986
- last permit issued
- Dec 1, 1985
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 1, 1985
- Shut in
- —
- Plugged
- Jun 25, 1987
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
Formation tops
As filed on W-2/G-1. Subsea from 1,589 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Dothan | 484 | 1,105 |
| Camp Colorado | 550 | 1,039 |
| Stockwether | 652 | 937 |
| Tannehill | 714 | 875 |
| B/Crystal Falls | 952 | 637 |
| Caddo | 3,560 | -1,971 |
| Barnett | 4,112 | -2,523 |
| Ellenburger | 4,230 | -2,641 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 715 | 724 | Perforated |
| 4,267 | 4,281 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 159 | 12.25 | 100 S |
| 4.5 | 800 | 7.875 | 240 S |
| 4.5 | 4,279 | 7.875 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 19, 1986 | Jan 10, 1986 | Yes |
| 00 | Mar 18, 1986 | — | — |
| 00 | May 13, 1985 | Apr 25, 1985 | — |
| 00 | May 7, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-34790 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-34790 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05934790, documented in the API reference.