WELL · 42-059-34866 · DISTRICT 7
Harville T. #1
Callahan County · St. Anthony (Gray) field · Vertical
Harville T. #1 (API 42-059-34866) is a plugged well in Callahan County, plugged January 7, 1996, last operated by Weed Oil & Gas International Inc.
The RRC has issued one drilling permit, issued March 23, 1984, permitted to 4,700 ft.
Completion filings report one formation top, including Gray.
Its lease has reported 2.59K barrels of oil and 4.64K mcf of gas since January 1993, last reporting in March 1996. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Weed Oil & Gas International Inc
Tye, TX · P-5 Y, filed Jan 13, 1987 · 3 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Weed Oil & Gas International Inc |
| Production reports | Dallas Production, Inc.through Jul 1995 |
| Latest permit | Weed Oil & Gas International IncMar 23, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,700
- total depth, ft
- 1
- permits on file
- Mar 23, 1984
- last permit issued
- May 10, 1984
- completed
- 2.59K
- cumulative oil, bbl
- 4.64K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 10, 1984
- Shut in
- —
- Plugged
- Jan 7, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Harville, T. O-8-21492 | Grand Old Oplin (Gray) | Dallas Production, Inc. | 3 | 2.59K | 4.64K | Jan 1993 – Mar 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dallas Production, Inc.Jan 1993 → Jul 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 233309-99 | Drill | Weed Oil & Gas International Inc | Apr 10, 1984 | Mar 23, 1984 | Apr 14, 1984 | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-21492 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,014 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gray | 3,912 | -1,898 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,912 | 3,920 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 112 | 11 | 80 sx |
| 4.5 | 3,985 | 7.875 | 150 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 28, 1984 | Jun 20, 1984 | — |
| 00 | Aug 24, 1984 | Jun 20, 1984 | — |
| 00 | Jun 15, 1984 | May 29, 1984 | — |
| 00 | Jun 13, 1984 | May 29, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-34866 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-34866 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05934866, documented in the API reference.