WELL · 42-059-34914 · DISTRICT 7
Click R.S. #4
Callahan County · Dorbandt (Strawn) field · Vertical
Click R.S. #4 (API 42-059-34914) is a plugged well in Callahan County, plugged December 21, 1993, last operated by E.G. Operating.
The RRC has issued 2 drilling permits between 1984 and 1985, permitted to 4,500 ft.
It was permitted by Aries Operating, Inc. and has since transferred to E.G. Operating on the wellbore schedule.
Completion filings report 4 formation tops, including Winchell, Palo Pinto, Gray, Caddo.
Operator of record
Permitted by Aries Operating, Inc.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Sep 6, 2002 · 72 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | E.G. Operating |
| Production reports | none |
| Latest permit | Aries Operating, Inc.Mar 11, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,500
- total depth, ft
- 2
- permits on file
- Mar 11, 1985
- last permit issued
- May 11, 1987
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 11, 1987
- Shut in
- —
- Plugged
- Dec 21, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Click, R.S. O-8-24246 | Dorbandt (Strawn) | E.G. Operating | 2 | 0 | 0 | Jan 1993 – Feb 1994 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 269844-99 | Recompletion | Aries Operating, Inc. | Mar 8, 1985 | Mar 11, 1985 | — | 4,426 |
| 236705-99 | Drill | Aries Operating, Inc. | Apr 23, 1984 | Apr 24, 1984 | Jun 3, 1984 | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-24246 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,892 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Winchell | 2,264 | -372 |
| Palo Pinto | 2,605 | -713 |
| Gray | 3,596 | -1,704 |
| Caddo | 3,664 | -1,772 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,596 | 3,604 | Perforated |
| 4,261 | 4,271 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 112 | 11 | 80 sx |
| 4.5 | 3,740 | 7.875 | 100 S |
| 4.5 | 4,426 | 7.875 | 150 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 18, 1987 | May 26, 1987 | — |
| 00 | Jun 8, 1987 | — | — |
| 00 | Apr 17, 1985 | Mar 8, 1985 | — |
| 00 | Apr 10, 1985 | — | — |
| 00 | Jul 25, 1984 | Jul 2, 1984 | — |
| 00 | Jul 20, 1984 | Jul 2, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-34914 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-34914 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05934914, documented in the API reference.