WELL · 42-059-34955 · DISTRICT 7

Whitehead 16 #1

Plugged

Callahan County · Extension (Ellen.) field  · Vertical

Whitehead 16 #1 (API 42-059-34955) is a plugged well in Callahan County, plugged June 8, 1987, last operated by Jones CO..

The RRC has issued one drilling permit, issued May 21, 1984, permitted to 4,600 ft.

Completion filings report 4 formation tops, including T/Caddo, B/Caddo, T/Barnett, T/Ellen.

Operator of record

Jones Co.

Albany, TX · P-5 Inactive, filed Apr 26, 1990 · 779 permits on file · (325) 762-3353

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJones Co.
Production reportsnone
Latest permitJones Co.May 21, 1984
4,600
total depth, ft
1
permits on file
May 21, 1984
last permit issued
Jun 26, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 26, 1984
Shut in
—
Plugged
Jun 8, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
239471-99DrillJones Co.May 18, 1984May 21, 1984—4,600

Formation tops

As filed on W-2/G-1. Subsea from 1,949 ft elevation.Download CSV →

FormationMD ftSubsea
T/Caddo3,886-1,937
B/Caddo4,309-2,360
T/Barnett4,422-2,473
T/Ellen4,486-2,537

Perforations

Perforated and open-hole intervals.

FromToType
4,4924,500Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510112.2560 sx
4.54,5067.875180 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 1984Jul 6, 1984—
00Jul 19, 1984Jul 6, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05934955, documented in the API reference.