WELL · 42-059-35121 · DISTRICT 7

Snyder 138A #1

Plugged

Callahan County · Wildcat field  · Vertical

Snyder 138a #1 (API 42-059-35121) is a plugged well in Callahan County, plugged December 30, 1988, last operated by Jones CO..

The RRC has issued one drilling permit, issued October 1, 1984, permitted to 4,500 ft.

Completion filings report 3 formation tops, including Morris Ls, Caddo, B/Caddo.

Operator of record

Jones Co.

Albany, TX · P-5 Inactive, filed Apr 26, 1990 · 779 permits on file · (325) 762-3353

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJones Co.
Production reportsnone
Latest permitJones Co.Oct 1, 1984
4,500
total depth, ft
1
permits on file
Oct 1, 1984
last permit issued
Dec 6, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 6, 1984
Shut in
—
Plugged
Dec 30, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
253286-99DrillJones Co.Sep 28, 1984Oct 1, 1984—4,500

Formation tops

As filed on W-2/G-1. Subsea from 1,734 ft elevation.Download CSV →

FormationMD ftSubsea
Morris LS2,728-994
Caddo3,739-2,005
B/Caddo4,145-2,411

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251071190 S
4.54,4177.875110 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 9, 1987Feb 25, 1987Yes
00Feb 28, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05935121, documented in the API reference.