WELL · 42-059-35187 · DISTRICT 7
Johnson S. #2
Callahan County · Grand Old Oplin (Gray) field · Vertical
Johnson S. #2 (API 42-059-35187) is a plugged well in Callahan County, plugged December 17, 1999, last operated by Smith Joe T. Inc..
The RRC has issued one drilling permit, issued November 26, 1984, permitted to 4,700 ft.
It was permitted by Mercury Exploration CO. and has since transferred to Smith Joe T. Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Gray, Caddo, Ellenburger.
Operator of record
Permitted by Mercury Exploration Co.; the EWA schedule now lists a different operator.
Hawley, TX · P-5 Y, filed Nov 3, 2006 · 1 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Smith Joe T. Inc. |
| Production reports | none |
| Latest permit | Mercury Exploration Co.Nov 26, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,700
- total depth, ft
- 1
- permits on file
- Nov 26, 1984
- last permit issued
- Aug 15, 1986
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 15, 1986
- Shut in
- —
- Plugged
- Dec 17, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnson, S. O-8-21277 | Grand Old Oplin (Gray) | Smith, Joe T. Inc. | 2 | 0 | 0 | Jan 1993 – Feb 2000 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 258891-99 | Drill | Mercury Exploration Co. | Dec 10, 1984 | Nov 26, 1984 | Dec 19, 1984 | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-21277 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,991 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gray | 3,893 | -1,902 |
| Caddo | 4,079 | -2,088 |
| Ellenburger | 4,525 | -2,534 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,672 | 2,720 | Perforated |
| 3,893 | 3,906 | Perforated |
| 3,909 | 3,912 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 125 | 11 | 75 S |
| 4.5 | 3,144 | 7.875 | 320 S |
| 4.5 | 4,618 | 7.875 | 375 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 31, 1986 | Oct 2, 1986 | — |
| 00 | Feb 20, 1985 | Jan 22, 1985 | — |
| 00 | Feb 13, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-35187 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-35187 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 13.7K
- bbl, last 12 reported months
- 701K
- bbl, all reported
- Jan 2000
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000061381 | W-14 Disposal | Plugged Feb 3, 2000 | 1,000 | 1,000 | 2,672–2,720 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 13,665 · prior 12 57,010(-76%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05935187, documented in the API reference.