WELL · 42-059-35423 · DISTRICT 7

Jones James #2

Plugged

Callahan County · Turnaround (Gray Sand) field  · Vertical

Jones James #2 (API 42-059-35423) is a plugged well in Callahan County, plugged November 21, 1996, last operated by R R Production 3.

The RRC has issued one drilling permit, issued September 3, 1985, permitted to 4,700 ft.

Completion filings report 4 formation tops, including Jennings, Gardner, Upper Gray, Lower Gray.

Its 2 leases have reported 24.4K barrels of oil and 19.7K mcf of gas since January 1993, last reporting in March 1997. The leases carry 36 wells, so these are lease totals, not this well alone.

Operator of record

R R Production 3

Cross Plains, TX · P-5 Y, filed Apr 1, 1992 · 11 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR R Production 3
Production reportsAop Operating Corporationthrough May 1996
Latest permitR R Production 3Sep 3, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,700
total depth, ft
1
permits on file
Sep 3, 1985
last permit issued
Nov 5, 1985
completed
24.4K
cumulative oil, bbl
19.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 5, 1985
Shut in
—
Plugged
Nov 21, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 36 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Clare (Gray) Unit O-8-27003Clare (Gray SD)Aop Operating Corporation3121K15KOct 1993 – Mar 1997
Jones, James O-8-23729Clare (Gray SD)Aop Operating Corporation53.42K4.66KJan 1993 – Dec 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1R R Operation IncJan 1993 → Feb 1993
  2. 2Aop Operating CorporationMar 1993 → May 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
283899-99DrillR R Production 3Aug 30, 1985Sep 3, 1985—4,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-23729————
—— O-8-27003————

Formation tops

As filed on W-2/G-1. Subsea from 1,991 ft elevation.Download CSV →

FormationMD ftSubsea
Jennings3,704-1,713
Gardner3,775-1,784
Upper Gray3,888-1,897
Lower Gray3,947-1,956

Perforations

Perforated and open-hole intervals.

FromToType
3,8953,900Perforated
3,9023,908Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510612.2590 S
8.62510612.590 S
5.53,9707.875106 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 22, 1993Oct 18, 1993—
00Sep 28, 1993——
00Jul 26, 1986——
00Dec 16, 1985Nov 27, 1985Yes
00Dec 10, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
271K
bbl, all reported
Jan 1997
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000079762H-1 InjectionPlugged Dec 9, 19964001,6003,850–3,930

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 138,028(-100%)

010K20K19961997

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05935423, documented in the API reference.