WELL · 42-059-35580 · DISTRICT 7

Jackson Elma #28

Plugged

Callahan County · Callahan County Regular field  · Vertical

Jackson Elma #28 (API 42-059-35580) is a plugged well in Callahan County, plugged August 14, 1986, last operated by Lewis Production CO. Inc..

The RRC has issued one drilling permit, issued April 22, 1986, permitted to 1,050 ft.

It was permitted by Lewis Production CO., Inc. and has since transferred to Lewis Production CO. Inc. on the wellbore schedule.

Operator of record

Lewis Production Co. Inc.

Permitted by Lewis Production Co., Inc.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitLewis Production Co., Inc.Apr 22, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,050
total depth, ft
1
permits on file
Apr 22, 1986
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Aug 14, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
301252-99DrillLewis Production Co., Inc.Apr 17, 1986Apr 22, 1986—1,050

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05935580, documented in the API reference.