WELL · 42-059-35606 · DISTRICT 7
Williams, Louie #9
Callahan County · Vertical
Williams, Louie #9 (API 42-059-35606) is a former disposal or injection well in Callahan County, last operated by Edwards, James; its UIC permit is no longer active.
The RRC has issued 2 drilling permits in 1986, permitted to 500 ft.
Completion filings report 3 formation tops, including Camp Colorado Lime, Camp Colo. Lime, Frye Sand.
Its lease has reported 10.3K barrels of oil and 23 mcf of gas since January 1993, last reporting in July 2026. The lease carries 23 wells, so these are lease totals, not this well alone.
Operator of record
Albany, TX · P-5 Y, filed Jan 7, 2000 · 8 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Ipactthrough Dec 2007 |
| Latest permit | Edwards, JamesDec 3, 1986 |
- 500
- total depth, ft
- 2
- permits on file
- Dec 3, 1986
- last permit issued
- —
- completed
- 10.3K
- cumulative oil, bbl
- 23
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 23 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Williams, Louie O-8-350 | Callahan County Regular | TX (Georgia) Holdings, Inc. | 23 | 10.3K | 23 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Edwards, JamesJan 1993 → Jul 1997
- 2Gemoil CompanyAug 1997 → Sep 2002
- 3IpactOct 2002 → Dec 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 323601-99 | Recompletion | Edwards, James | Nov 26, 1986 | Dec 3, 1986 | — | 500 |
| 302710-99 | Drill | Edwards, James | May 21, 1986 | May 27, 1986 | — | 500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-350 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Camp Colorado Lime | 180 |
| Camp Colo. Lime | 181 |
| Frye Sand | 223 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 259 | 267 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 312 | 6.125 | 35 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 2, 1992 | Feb 6, 1992 | — |
| 00 | Oct 29, 1986 | Sep 30, 1986 | Yes |
| 00 | Oct 9, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-35606 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-35606 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 254K
- bbl, all reported
- Feb 2010
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000069877 | H-1 Injection | Plugged Jun 28, 2010 | 150 | 125 | 259–267 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05935606, documented in the API reference.