WELL · 42-059-35638 · DISTRICT 7

Wallace #8605

Plugged

Callahan County · Baum field  · Vertical

Wallace #8605 (API 42-059-35638) is a plugged well in Callahan County, plugged December 15, 1991, last operated by Oxoil Inc..

The RRC has issued one drilling permit, issued August 14, 1986, permitted to 4,000 ft.

It was permitted by Welltex Energy Corporation and has since transferred to Oxoil Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Palo Pinto, Ellenburger.

Operator of record

Oxoil Inc.

Permitted by Welltex Energy Corporation; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed May 15, 1991

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOxoil Inc.
Production reportsnone
Latest permitWelltex Energy CorporationAug 14, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Aug 14, 1986
last permit issued
Jul 12, 1988
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 12, 1988
Shut in
—
Plugged
Dec 15, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— O-8-23785——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
305237-99DrillWelltex Energy CorporationAug 13, 1986Aug 14, 1986—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-23785————

Formation tops

As filed on W-2/G-1. Subsea from 1,748 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto2,972-1,224
EllenburgerELLENBERGER3,816-2,068

Perforations

Perforated and open-hole intervals.

FromToType
3,8163,842Perforated
3,9383,943Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510012.25100 S
4.54,0787.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 12, 1988Aug 11, 1988—
00Sep 3, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.2K
bbl, last 12 reported months
1.2K
bbl, all reported
Apr 1989
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000067481H-1 InjectionPlugged Feb 5, 19927501,0003,816–3,950

MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS

Last 12 months 1,200

05001K1.5K

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05935638, documented in the API reference.