WELL · 42-059-35702 · DISTRICT 7

Gifford #1

Y

Callahan County · Three Aces (Flippen) field · Shut IN  · Vertical

Gifford #1 (API 42-059-35702) is a well in Callahan County operated by Sojourner Drilling Corporation, completed December 5, 1990 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued January 9, 1987, permitted to 1,900 ft.

It was permitted by Paleosearch and has since transferred to Sojourner Drilling Corporation on the wellbore schedule.

Completion filings report 6 formation tops, including Saddle Creek, Top Saddle Crk, Flippen Sand, Top Flippen Sd.

Its lease has reported 11.4K barrels of oil and 19 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Sojourner Drilling Corporation

Permitted by Paleosearch; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Jul 4, 2026 · 872 permits on file · (325) 669-2068

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSojourner Drilling Corporation
Production reportsBorden, Roland Inc.through Jun 2015
Latest permitPaleosearchJan 9, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,900
total depth, ft
1
permits on file
Jan 9, 1987
last permit issued
Dec 5, 1990
completed
11.4K
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 5, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gifford O-8-24627Three Aces (Flippen)Sojourner Drilling Corporation211.4K19Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1PaleosearchFeb 1993 → Oct 1994
  2. 2Borden, Roland Inc.Nov 1994 → Jun 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
325284-99DrillPaleosearchJan 9, 1987Jan 9, 1987Jan 7, 19871,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-24627————

Formation tops

As filed on W-2/G-1. Subsea from 1,961 ft elevation.Download CSV →

FormationMD ftSubsea
Saddle Creek1,626335
Top Saddle CRK1,626335
Flippen Sand1,666295
Top Flippen SD1,666295
Cook Lime1,692269
Top Cook LM1,692269

Perforations

Perforated and open-hole intervals.

FromToType
1,6681,671Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251001150 S
5.51,7567.875330 S
4.51,7567.875330 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 15, 2024Sep 12, 2023—
00Feb 1, 1991Dec 10, 1990—
00Jan 7, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
31.6K
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000074433H-1 InjectionActive802001,668–1,671

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05935702, documented in the API reference.