WELL · 42-059-36042 · DISTRICT 7

Malu #1

N

Callahan County · Mask (Caddo) field  · Vertical

Malu #1 (API 42-059-36042) is a well in Callahan County operated by Anderson Production, completed January 21, 1990.

The RRC has issued 2 drilling permits (amended once) between 1989 and 2004, permitted to 4,200 ft.

It was permitted by Anderson, E. D. and has since transferred to Anderson Production on the wellbore schedule.

Completion filings report 2 formation tops, including Cross Cut Sand, Caddo.

Its 3 leases have reported 4.39K barrels of oil and 88.1K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Anderson Production

Permitted by Anderson, E. D.; the EWA schedule now lists a different operator.

Cisco, TX · P-5 Y, filed Aug 4, 2025 · 3 permits on file · (817) 994-6774

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnderson Production
Production reportsAnderson Productionthrough Apr 2014
Latest permitAnderson, E. D.Jul 29, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,200
total depth, ft
3
permits on file
Jul 29, 2004
last permit issued
Jan 21, 1990
completed
4.39K
cumulative oil, bbl
88.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 21, 1990
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Malu G-8-206532Callahan County Regular (Gas)Anderson Production1020.8KMay 2004 – Jul 2026
Malu O-8-26400Mask (Caddo)Anderson Production14.39K67.3KJan 1993 – Jul 2026
— G-8-133741——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Reef Exploration, Inc. (A-1)Jan 1993 → Jul 1993
  2. 2Yellow Rose Oil & Gas OperatingAug 1993 → Sep 1993
  3. 3M H W, Inc.Dec 1993 → Jul 1996
  4. 4Anderson, E. D.Aug 1996 → Nov 2009
  5. 5Anderson ProductionDec 2009 → Apr 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
547865-99RecompletionAnderson, E. D.Jul 6, 2004Jul 29, 2004—3,274
366965-98DrillReef Exploration, Inc. (A-1)Mar 12, 1990Nov 29, 1989—4,200
366965-99DrillReef Exploration, Inc. (A-1)Nov 27, 1989Nov 29, 1989—4,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-133741————
—— G-8-206532————
—— O-8-26400————

Formation tops

As filed on W-2/G-1. Subsea from 1,536 ft elevation.Download CSV →

FormationMD ftSubsea
Cross Cut Sand2,140-604
Caddo3,235-1,699
CaddoCADDO LIME3,240-1,704

Perforations

Perforated and open-hole intervals.

FromToType
3,2353,274Perforated
3,2403,243Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625138—100 S
8.62514812.25100 S
4.53,2757.875200 S
4.53,302—200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 26, 2005Jun 3, 2004Yes
00Mar 2, 2005——
00Mar 3, 1992Dec 23, 1991—
00Jan 10, 1992——
00Mar 27, 1990Feb 22, 1990Yes
00Mar 22, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05936042, documented in the API reference.