WELL · 42-059-36085 · DISTRICT 7

Alexander #2

Plugged

Callahan County · Callahan County Regular (Gas) field  · Vertical

Alexander #2 (API 42-059-36085) is a plugged well in Callahan County, plugged August 29, 1995, last operated by Fidelity American Oil & Gas Inc..

The RRC has issued one drilling permit, issued June 28, 1990, permitted to 2,000 ft.

Completion filings report one formation top, including Tannehill.

Operator of record

Fidelity American Oil & Gas Inc.

Plano, TX · P-5 Y, filed Aug 11, 2000 · 6 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFidelity American Oil & Gas Inc.
Production reportsnone
Latest permitFidelity American Oil & Gas,inc.Jun 28, 1990
2,000
total depth, ft
1
permits on file
Jun 28, 1990
last permit issued
Jan 20, 1991
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1995

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 20, 1991
Shut in
—
Plugged
Aug 29, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Alexander G-8-139365Callahan County Regular (Gas)Fidelity American Oil & Gas,inc.100Jan 1993 – Aug 1995

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
374993-99DrillFidelity American Oil & Gas,inc.Jun 28, 1990Jun 28, 1990Jul 10, 19902,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-139365————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Tannehill502

Perforations

Perforated and open-hole intervals.

FromToType
502505Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.57446.75120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 24, 1991May 31, 1991Yes
00Oct 2, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05936085, documented in the API reference.