WELL · 42-059-36149 · DISTRICT 7
Diller #2A
Callahan County · Herr-King (Moran) field · Vertical
Diller #2A (API 42-059-36149) is a plugged well in Callahan County, plugged June 27, 2006, last operated by Tex-Ann Oil & Gas Services Inc..
The RRC has issued one drilling permit, issued March 26, 1991, permitted to 2,500 ft.
Completion filings report 3 formation tops, including Palo Pinto, Moran Sand, Morris Sand.
Operator of record
Tex-Ann Oil & Gas Services Inc.
Abilene, TX · P-5 Y, filed Jul 8, 2011 · 47 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tex-Ann Oil & Gas Services Inc. |
| Production reports | none |
| Latest permit | Tex-Ann Oil & Gas Services, Inc.Mar 26, 1991 |
- 2,500
- total depth, ft
- 1
- permits on file
- Mar 26, 1991
- last permit issued
- Sep 5, 1991
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 5, 1991
- Shut in
- —
- Plugged
- Jun 27, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Diller O-8-26025 | Herr-King (Moran) | Tex-Ann Oil & Gas Services, Inc. | 2 | 0 | 0 | Jan 1993 – Mar 2008 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 386114-99 | Drill | Tex-Ann Oil & Gas Services, Inc. | Mar 26, 1991 | Mar 26, 1991 | Mar 26, 1991 | 2,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-26025 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,518 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 2,125 | -607 |
| Moran Sand | 2,345 | -827 |
| Morris Sand | 2,410 | -892 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,345 | 2,355 | Perforated |
| 2,410 | 2,420 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 100 | 12.25 | 70 S |
| 4.5 | 2,458 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 17, 1993 | Apr 19, 1993 | Yes |
| 00 | May 25, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-36149 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-36149 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05936149, documented in the API reference.