WELL · 42-059-36174 · DISTRICT 7
Eaton #3
Callahan County · Britni Ann (Ellenburger) field · Vertical
Eaton #3 (API 42-059-36174) is a plugged well in Callahan County, plugged June 14, 1996, last operated by Stf Exploration Inc..
The RRC has issued one drilling permit (amended once), issued June 21, 1991, permitted to 4,700 ft.
It was permitted by Startex Energy, Inc. and has since transferred to Stf Exploration Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Palo Pinto, Gray, Ellenburger.
Its lease has reported 346 barrels of oil since January 1993, last reporting in August 2003.
Operator of record
Permitted by Startex Energy, Inc.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Sep 3, 1999 · 22 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | STF Exploration Inc. |
| Production reports | STF Exploration, Inc.through Jul 1994 |
| Latest permit | Startex Energy, Inc.Jun 21, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,700
- total depth, ft
- 2
- permits on file
- Jun 21, 1991
- last permit issued
- Sep 10, 1991
- completed
- 346
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 10, 1991
- Shut in
- —
- Plugged
- Jun 14, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Eaton O-8-26383 | Britni Ann (Ellenburger) | STF Exploration, Inc. | 1 | 346 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1STF Exploration, Inc.Jun 1994 → Jul 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 389060-98 | Drill | Startex Energy, Inc. | Nov 25, 1991 | Jun 21, 1991 | Jun 27, 1991 | 4,700 |
| 389060-99 | Drill | Startex Energy, Inc. | Jun 18, 1991 | Jun 21, 1991 | — | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-26383 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Palo Pinto | 3,000 |
| Gray | 3,836 |
| Ellenburger | 4,500 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,530 | 4,600 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 105 | 12.25 | 70 S |
| 4.5 | 4,628 | 7.875 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 21, 1992 | Dec 10, 1991 | Yes |
| 00 | Dec 18, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-36174 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-36174 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05936174, documented in the API reference.