WELL · 42-059-36277 · DISTRICT 7

Herr-King Field Unit #720

Plugged

Callahan County · Herr-King (Cross Cut) field  · Vertical

Herr-King Field Unit #720 (API 42-059-36277) is a plugged well in Callahan County, plugged December 10, 2010, last operated by Van Operating Ltd..

The RRC has issued one drilling permit, issued April 1, 1993, permitted to 2,900 ft.

It was permitted by Jones Company, Ltd. and has since transferred to Van Operating Ltd. on the wellbore schedule.

Completion filings report 3 formation tops, including T/Palo Pinto, B/Palo Pinto, T/Cross Cut.

Its lease has reported 248K barrels of oil and 20.2K mcf of gas since January 1993, last reporting in August 2011. The lease carries 27 wells, so these are lease totals, not this well alone.

Operator of record

Van Operating Ltd.

Permitted by Jones Company, Ltd.; the EWA schedule now lists a different operator.

Albany, TX · P-5 Y, filed Dec 10, 2021 · 96 permits on file · (325) 725-4542

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVan Operating Ltd.
Production reportsVan Operating, Ltd.through Mar 2010
Latest permitJones Company, Ltd.Apr 1, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,900
total depth, ft
1
permits on file
Apr 1, 1993
last permit issued
Dec 11, 1999
completed
248K
cumulative oil, bbl
20.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 11, 1999
Shut in
—
Plugged
Dec 10, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 27 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Herr-King Field Unit O-8-8482Herr-King (Cross Cut)Van Operating, Ltd.27248K20.2KJan 1993 – Aug 2011

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Company, Ltd.Jan 1993 → Jul 1995
  2. 2Van Operating, Ltd.Aug 1995 → Mar 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
410237-99DrillJones Company, Ltd.Mar 29, 1993Apr 1, 1993Apr 9, 19932,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-8482————

Formation tops

As filed on W-2/G-1. Subsea from 1,728 ft elevation.Download CSV →

FormationMD ftSubsea
T/Palo Pinto2,376-648
B/Palo Pinto2,523-795
T/Cross Cut2,567-839

Perforations

Perforated and open-hole intervals.

FromToType
2,5682,624Perforated
2,6052,609Perforated
2,6112,615Perforated
2,6172,624Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251121185 S
4.52,7277.875385 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 13, 2000Jan 19, 2000—
00Jul 12, 1993May 14, 1993Yes
00Jun 4, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
928K
bbl, all reported
Jan 2011
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089282H-1 InjectionPlugged Dec 20, 20107501,2002,568–2,624

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 86,338(-100%)

05K10K15K20102011

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05936277, documented in the API reference.