WELL · 42-059-36319 · DISTRICT 7
Jackson D #28
Callahan County · Callahan County Regular field · Vertical
Jackson D #28 (API 42-059-36319) is a plugged well in Callahan County, plugged April 29, 2025, last operated by Herd Producing Company Inc..
The RRC has issued one drilling permit, issued September 29, 1993, permitted to 1,000 ft.
It was permitted by Greene, R. E. and has since transferred to Herd Producing Company Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Stockweather Lime, Tannehill.
Its lease has reported 113K barrels of oil and 22 mcf of gas since January 1993, last reporting in July 2026. The lease carries 28 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Greene, R. E.; the EWA schedule now lists a different operator.
Tyler, TX · P-5 Y, filed Dec 4, 2025 · 159 permits on file · (936) 546-5238
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Herd Producing Company Inc. |
| Production reports | Herd Producing Company, Inc.through Jun 2022 |
| Latest permit | Greene, R. E.Sep 29, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,000
- total depth, ft
- 1
- permits on file
- Sep 29, 1993
- last permit issued
- Apr 17, 1997
- completed
- 113K
- cumulative oil, bbl
- 22
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 17, 1997
- Shut in
- —
- Plugged
- Apr 29, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 28 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jackson "D" O-8-17537 | Callahan County Regular | Herd Producing Company, Inc. | 28 | 113K | 22 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Greene, R. E.Jan 1993 → Jul 1998
- 2Tracker MineralAug 1998 → Aug 1999
- 3PC Exploration, L.L.C.Sep 1999 → Jul 2001
- 4Baby Doe Resources LLCAug 2001 → Dec 2001
- 5Abernathy Auto, Inc.Jan 2002 → May 2015
- 6Plateau Energy, LLCJun 2015 → Aug 2015
- 7Ohlhausen Oil CompanyDec 2018 → May 2022
- 8Herd Producing Company, Inc.Jun 2022 → Jun 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 416387-99 | Drill | Greene, R. E. | Sep 24, 1993 | Sep 29, 1993 | Aug 19, 1994 | 1,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-17537 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Stockweather Lime | 766 |
| TannehillTANNEHILL SAND | 780 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 780 | 782 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7.625 | 42 | 11 | 25 S |
| 4.5 | 780 | 6.75 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 15, 1997 | May 13, 1997 | — |
| 00 | Nov 16, 1994 | Oct 3, 1994 | Yes |
| 00 | Oct 7, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-36319 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-36319 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 1.65K
- bbl, last 12 reported months
- 804K
- bbl, all reported
- Feb 2022
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000084317 | H-1 Injection | Plugged May 28, 2025 | 300 | 390 | 780–782 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 1,649 · prior 12 59,817(-97%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05936319, documented in the API reference.