WELL · 42-059-36475 · DISTRICT 7
George #6303
Callahan County · Putnam NW. (Tannehill) field · Vertical
George #6303 (API 42-059-36475) is a plugged well in Callahan County, plugged March 26, 2012, last operated by Spence Energy Company.
The RRC has issued one drilling permit (amended once), issued July 6, 1998, permitted to 800 ft.
Completion filings report one formation top, including Tannehill.
Operator of record
Dallas, TX · P-5 Y, filed May 4, 2026 · 96 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Spence Energy Company |
| Production reports | Spence Energy Companythrough Sep 1998 |
| Latest permit | Spence Energy CompanyJul 6, 1998 |
- 800
- total depth, ft
- 2
- permits on file
- Jul 6, 1998
- last permit issued
- Sep 21, 1998
- completed
- 0
- cumulative oil, bbl
- 241
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1998 THROUGH Mar 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 21, 1998
- Shut in
- —
- Plugged
- Mar 26, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| George G-8-170597 | Putnam, NW. (Tannehill) | Spence Energy Company | 1 | 0 | 241 | Sep 1998 – Mar 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Spence Energy CompanySep 1998 → Sep 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 477526-98 | Drill | Spence Energy Company | Oct 1, 1998 | Jul 6, 1998 | Aug 31, 1998 | 800 |
| 477526-99 | Drill | Spence Energy Company | Jun 29, 1998 | Jul 6, 1998 | — | 800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-170597 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,545 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Tannehill | 704 | 841 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 704 | 706 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 757 | 6.25 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 25, 2004 | Oct 6, 2003 | — |
| 00 | Feb 20, 2004 | Dec 4, 2003 | — |
| 00 | Jan 25, 1999 | Nov 12, 1998 | Yes |
| 00 | Nov 6, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-36475 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-36475 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 3.76K
- bbl, all reported
- Jan 2012
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000088975 | H-1 Injection | Plugged May 21, 2012 | 300 | 350 | 704–716 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05936475, documented in the API reference.