WELL · 42-059-36478 · DISTRICT 7
George #6304
Callahan County · Putnam N. (Caddo 3250) field · Vertical
George #6304 (API 42-059-36478) is a plugged well in Callahan County, plugged April 18, 2019, last operated by Spence Energy Company.
The RRC has issued one drilling permit (amended once), issued September 23, 1998, permitted to 4,500 ft.
Completion filings report 2 formation tops, including Caddo, Duffer.
Its 2 leases have reported 5.62K barrels of oil and 88.2K mcf of gas since October 1998, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Dallas, TX · P-5 Y, filed May 4, 2026 · 96 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Spence Energy Company |
| Production reports | Spence Energy Companythrough Feb 2011 |
| Latest permit | Spence Energy CompanySep 23, 1998 |
- 4,500
- total depth, ft
- 2
- permits on file
- Sep 23, 1998
- last permit issued
- Nov 12, 1998
- completed
- 5.62K
- cumulative oil, bbl
- 88.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 12, 1998
- Shut in
- —
- Plugged
- Apr 18, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| George, Kenneth G-8-201674 | Putnam, N. (Caddo 3250) | Spence Energy Company | 1 | 0 | 20.8K | May 2004 – Jul 2026 |
| George O-8-28552 | Putnam, N. (Caddo 3250) | Spence Energy Company | 2 | 5.62K | 67.3K | Oct 1998 – Feb 2005 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Spence Energy CompanyNov 1998 → Feb 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 479584-98 | Drill | Spence Energy Company | Oct 13, 1998 | Sep 23, 1998 | Oct 3, 1998 | 4,500 |
| 479584-99 | Drill | Spence Energy Company | Sep 21, 1998 | Sep 23, 1998 | — | 4,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-201674 | — | — | — | — |
| — | — O-8-28552 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,563 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,512 | 3,524 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 115 | 12.25 | 90 S |
| 8.625 | 115 | 12.75 | 90 S |
| 5.5 | 4,220 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 26, 2004 | Jun 9, 2004 | — |
| 00 | Jun 24, 2004 | — | — |
| 00 | Jan 11, 1999 | Nov 25, 1998 | Yes |
| 00 | Dec 18, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-36478 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-36478 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05936478, documented in the API reference.