WELL · 42-059-36593 · DISTRICT 7
Snyder 117 B #3
Callahan County · Callahan County Regular field · Vertical
Snyder 117 B #3 (API 42-059-36593) is a plugged well in Callahan County, plugged March 8, 2023, last operated by Williams Deville Operating Inc..
The RRC has issued one drilling permit, issued January 25, 2002, permitted to 4,400 ft.
It was permitted by Loch Energy, Inc and has since transferred to Williams Deville Operating Inc. on the wellbore schedule.
Completion filings report one formation top, including Strawn.
Operator of record
Williams Deville Operating Inc.
Permitted by Loch Energy, Inc; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Nov 4, 2025 · (325) 201-4770
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Williams Deville Operating Inc. |
| Production reports | none |
| Latest permit | Loch Energy, IncJan 25, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,400
- total depth, ft
- 1
- permits on file
- Jan 25, 2002
- last permit issued
- Oct 19, 2005
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 19, 2005
- Shut in
- —
- Plugged
- Mar 8, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Snyder "117" B O-8-29665 | Callahan County Regular | Williams Deville Operating, Inc. | 1 | 0 | 0 | Dec 2005 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 517116-99 | Drill | Loch Energy, Inc | Jan 25, 2002 | Jan 25, 2002 | Jan 30, 2002 | 4,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29665 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,712 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 2,900 | -1,188 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,900 | 3,058 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 102 | 12.25 | 110 S |
| 4.5 | 4,263 | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 8, 2006 | Dec 8, 2005 | — |
| 00 | Jan 12, 2006 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-36593 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-36593 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 15.6K
- bbl, all reported
- Feb 2019
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000095394 | H-1 Injection | Plugged Mar 13, 2023 | 500 | 1,450 | 2,900–3,058 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05936593, documented in the API reference.