WELL · 42-059-36641 · DISTRICT 7
Finley #1
Callahan County · Finley (Congl.) field · NO Production · Vertical
Finley #1 (API 42-059-36641) is a well in Callahan County operated by Iron Bell Operating LLC, completed March 5, 2005 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit, issued February 1, 2005, permitted to 4,000 ft.
It was permitted by West Inland Energy, Inc. and has since transferred to Iron Bell Operating LLC on the wellbore schedule.
Completion filings report 2 formation tops, including T. Palo Pinto Lm, T. Bend Conglomerate.
Its lease has reported 20.3K barrels of oil and 355K mcf of gas since March 2005, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by West Inland Energy, Inc.; the EWA schedule now lists a different operator.
Lubbock, TX · P-5 Y, filed Feb 4, 2026 · (806) 778-6510
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Iron Bell Operating LLC |
| Production reports | Iron Bell Operating, LLCthrough Mar 2025 |
| Latest permit | West Inland Energy, Inc.Feb 1, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Feb 1, 2005
- last permit issued
- Mar 5, 2005
- completed
- 20.3K
- cumulative oil, bbl
- 355K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 5, 2005
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Finley O-8-29556 | Finley (Congl.) | Iron Bell Operating, LLC | 2 | 20.3K | 355K | Mar 2005 – Jul 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 6,926(-100%)
Oil, barrels lease total
Last 12 months 0 · prior 12 40(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1West Inland Energy, Inc.Mar 2005 → Dec 2024
- 2Iron Bell Operating, LLCJan 2025 → Mar 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 556989-99 | Drill | West Inland Energy, Inc. | Jan 28, 2005 | Feb 1, 2005 | — | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29556 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,464 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T. Palo Pinto LM | 1,942 | -478 |
| T. Bend Conglomerate | 3,677 | -2,213 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,678 | 3,684 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 110 | 12.25 | 70 S |
| 4.5 | 4,016 | 7.875 | 190 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 26, 2005 | Mar 16, 2005 | Yes |
| 00 | May 9, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-059-36641 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-059-36641 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05936641, documented in the API reference.