WELL · 42-061-30471 · DISTRICT 4

Vista del Mar #1

Plugged

Cameron County · Vista del Mar (Miocene 7300 A) field  · Vertical

Vista Del Mar #1 (API 42-061-30471) is a plugged well in Cameron County, plugged November 2, 2005, last operated by Awp Operating Company.

The RRC has issued 3 drilling permits between 1989 and 2000, permitted to 7,700 ft.

It was permitted by Atasca Resources, Inc. and has since transferred to Awp Operating Company on the wellbore schedule.

Completion filings report one formation top, including Miocene (undifferentiated).

Operator of record

Awp Operating Company

Permitted by Atasca Resources, Inc.; the EWA schedule now lists a different operator.

George West, TX · P-5 Y, filed Sep 4, 2025 · 91 permits on file · (210) 508-5763

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAwp Operating Company
Production reportsAwp Operating Companythrough Aug 2005
Latest permitAtasca Resources, Inc.Jun 1, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,700
total depth, ft
3
permits on file
Jun 1, 2000
last permit issued
Dec 1, 1989
completed
0
cumulative oil, bbl
988K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2005

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 1, 1989
Shut in
—
Plugged
Nov 2, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vista del Mar G-4-177720Vista del Mar (Miocene 7150)Awp Operating Company10106KFeb 2000 – Nov 2005
Vista del Mar G-4-133363Vista del Mar (Miocene 7300 A)Atasca Resources, Inc.10882KJan 1993 – Feb 2000
— G-4-131582——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Scana Petroleum Resources, Inc.Jan 1993 → May 1996
  2. 2Atasca Resources, Inc.Jun 1996 → Jun 2000
  3. 3Awp Operating CompanyJul 2000 → Aug 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
495574-99RecompletionAtasca Resources, Inc.May 26, 2000Jun 1, 2000Feb 12, 20007,618
366218-99RecompletionMarquee CorporationNov 9, 1989Nov 13, 1989—7,618
358975-99DrillMarquee CorporationMay 5, 1989May 8, 1989—7,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-131582————
—— G-4-133363————
—— G-4-177720————

Formation tops

As filed on W-2/G-1. Subsea from 7 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE 70006,929-6,922
Miocene (undifferentiated)MIOCENE 7000'6,929-6,922
Miocene (undifferentiated)MIOCENE 71507,074-7,067
Miocene (undifferentiated)MIOCENE 7150'7,074-7,067
Miocene (undifferentiated)MIOCENE 73007,284-7,277
Miocene (undifferentiated)MIOCENE 7300'7,284-7,277

Perforations

Perforated and open-hole intervals.

FromToType
7,0947,098Perforated
7,1247,129Perforated
7,3037,310Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62556312.25190 S
4.57,6188.75460 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 7, 2000May 15, 2000Yes
00Jul 27, 2000——
00Apr 26, 1990Jan 9, 1990Yes
00Feb 28, 1990——
00Sep 27, 1989Aug 4, 1989Yes
00Aug 23, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06130471, documented in the API reference.