WELL · 42-065-31332 · DISTRICT 10
Sheridan #5
Carson County · Panhandle Carson County Field field · Vertical
Sheridan #5 (API 42-065-31332) is a plugged well in Carson County, plugged April 30, 2009, last operated by Rio Petroleum Inc..
The RRC has issued one drilling permit, issued October 22, 1982, permitted to 3,300 ft.
It was permitted by Spradling & Bryan and has since transferred to Rio Petroleum Inc. on the wellbore schedule.
Completion filings report one formation top, including Granite Wash.
Operator of record
Permitted by Spradling & Bryan; the EWA schedule now lists a different operator.
Amarillo, TX · P-5 Y, filed Jul 4, 2026 · 128 permits on file · (806) 290-4855
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rio Petroleum Inc. |
| Production reports | none |
| Latest permit | Spradling & BryanOct 22, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,300
- total depth, ft
- 1
- permits on file
- Oct 22, 1982
- last permit issued
- Jul 6, 1983
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 6, 1983
- Shut in
- —
- Plugged
- Apr 30, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sheridan O-14-5136 | Panhandle Carson County Field | Rio Petroleum, Inc. | 3 | 0 | 0 | Jan 1993 – Nov 2012 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 176794-99 | Drill | Spradling & Bryan | Oct 22, 1982 | Oct 22, 1982 | Oct 22, 1982 | 3,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-5136 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,309 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Granite WashGRANITE WASH LIME | 3,108 | 201 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,914 | 3,060 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 774 | 12.25 | 280 S |
| 4.2 | 3,197 | 7.875 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 20, 1984 | Oct 29, 1984 | — |
| 00 | Nov 9, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-065-31332 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-065-31332 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 7.78K
- bbl, all reported
- Apr 2004
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000047716 | H-1 Injection | Plugged May 19, 2009 | 0 | 0 | 0–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/06531332, documented in the API reference.