WELL · 42-065-31526 · DISTRICT 10

Ford #2

Plugged

Carson County · Panhandle Carson County Field field  · Vertical

Ford #2 (API 42-065-31526) is a plugged well in Carson County, plugged July 18, 1991, last operated by Dakkar Production Company.

The RRC has issued one drilling permit, issued August 24, 1983, permitted to 3,450 ft.

Completion filings report one formation top, including Wolfcamp.

Operator of record

Dakkar Production Company

Pampa, TX · P-5 Y, filed Jun 10, 1993 · 17 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDakkar Production Company
Production reportsnone
Latest permitDakkar Production CompanyAug 24, 1983
3,450
total depth, ft
1
permits on file
Aug 24, 1983
last permit issued
Oct 20, 1983
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 20, 1983
Shut in
—
Plugged
Jul 18, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— O-14-5681——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
207061-99DrillDakkar Production CompanyAug 12, 1983Aug 24, 1983—3,450

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-5681————

Formation tops

As filed on W-2/G-1. Subsea from 3,315 ft elevation.Download CSV →

FormationMD ftSubsea
Wolfcamp2,496819

Perforations

Perforated and open-hole intervals.

FromToType
2,8763,394Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,20612.25450 S
5.53,4507.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 29, 1984Nov 2, 1983—
00Mar 9, 1984Nov 2, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06531526, documented in the API reference.