WELL · 42-065-31889 · DISTRICT 10
Taylor 62 #1
Carson County · Panhandle West field · Producing · Vertical
Taylor 62 #1 (API 42-065-31889) is a well in Carson County operated by Pantera Energy Company, completed April 14, 1987 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued April 2, 1987, permitted to 3,200 ft.
It was permitted by Spradling, L. R. and has since transferred to Pantera Energy Company on the wellbore schedule.
Completion filings report 3 formation tops, including Red Cave, Brown Dolomite, Granite Wash.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Spradling, L. R.; the EWA schedule now lists a different operator.
Amarillo, TX · P-5 Y, filed Aug 4, 2025 · 359 permits on file · (806) 673-9438
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pantera Energy Company |
| Production reports | Pantera Energy Companythrough Apr 2026 |
| Latest permit | Spradling, L. R.Apr 2, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,200
- total depth, ft
- 1
- permits on file
- Apr 2, 1987
- last permit issued
- Apr 14, 1987
- completed
- 0
- cumulative oil, bbl
- 562K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 14, 1987
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Taylor 62 G-14-124642 | Panhandle, West | Pantera Energy Company | 1 | 0 | 562K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 14,887 · prior 12 12,355(+20%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1M E G G , Inc.Jan 1993 → Sep 2003
- 2Megg, L.P.Oct 2003 → Dec 2006
- 3Pantera Energy CompanyJan 2007 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 328509-99 | Drill | Spradling, L. R. | Apr 1, 1987 | Apr 2, 1987 | — | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-124642 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,223 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Cave | 1,653 | 1,570 |
| Brown Dolomite | 2,301 | 922 |
| Granite Wash | 2,596 | 627 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,332 | 2,594 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 451 | 17.5 | 150 S |
| 8.625 | 1,436 | 12.25 | 450 S |
| 5.5 | 2,738 | 7.875 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 10, 1990 | Dec 27, 1989 | — |
| 00 | Aug 21, 1987 | Jul 9, 1987 | Yes |
| 00 | Aug 20, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-065-31889 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-065-31889 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/06531889, documented in the API reference.