WELL · 42-065-31907 · DISTRICT 10
Sheridan A #1
Carson County · Panhandle Carson County Field field · Vertical
Sheridan A #1 (API 42-065-31907) is a plugged well in Carson County, plugged June 14, 2001, last operated by Williams W. R..
The RRC has issued one drilling permit (amended twice), issued May 31, 1988, permitted to 3,500 ft.
It was permitted by Vrk Operating Company, Inc. and has since transferred to Williams W. R. on the wellbore schedule.
Completion filings report 5 formation tops, including Panhandle Lime, Brown Dolomite, White Dolomite, Arkose.
Operator of record
Permitted by VRK Operating Company, Inc.; the EWA schedule now lists a different operator.
Amarillo, TX · P-5 Y, filed Sep 14, 2001 · 5 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Williams W. R. |
| Production reports | none |
| Latest permit | VRK Operating Company, Inc.May 31, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,500
- total depth, ft
- 3
- permits on file
- May 31, 1988
- last permit issued
- May 1, 1989
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 1, 1989
- Shut in
- —
- Plugged
- Jun 14, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sheridan "A" O-14-6640 | Panhandle Carson County Field | Williams, W. R. | 1 | 0 | 0 | Jan 1993 – Aug 2001 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 347076-97 | Drill | VRK Operating Company, Inc. | Jan 9, 1989 | May 31, 1988 | — | 3,500 |
| 347076-98 | Drill | VRK Operating Company, Inc. | Dec 27, 1988 | May 31, 1988 | — | 3,500 |
| 347076-99 | Drill | VRK Operating Company, Inc. | May 27, 1988 | May 31, 1988 | — | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-6640 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,313 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Panhandle Lime | 1,920 | 1,393 |
| Brown Dolomite | 2,571 | 742 |
| White Dolomite | 2,714 | 599 |
| Arkose | 2,821 | 492 |
| Weathered Granite | 2,999 | 314 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,074 | 3,244 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 726 | 12.25 | 160 S |
| 4.5 | 3,400 | 7.875 | 260 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 26, 1989 | May 30, 1989 | Yes |
| 00 | Jun 15, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-065-31907 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-065-31907 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/06531907, documented in the API reference.