WELL · 42-065-32015 · DISTRICT 10

Dauer #3

Y

Carson County · Panhandle West field · Producing  · Vertical

Dauer #3 (API 42-065-32015) is a well in Carson County operated by 6a Production, completed December 4, 1997 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 5, 1997, permitted to 2,950 ft.

It was permitted by G. H. Ranch, Inc. and has since transferred to 6a Production on the wellbore schedule.

Completion filings report one formation top, including Brown Dolo..

No lease production has been reported under this well’s leases.

Operator of record

6A Production

Permitted by G. H. Ranch, Inc.; the EWA schedule now lists a different operator.

Pampa, TX · P-5 Y, filed Oct 4, 2025 · (806) 664-1675

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedule6A Production
Production reportsG. H. Ranch, LLCthrough Jan 2025
Latest permitG. H. Ranch, Inc.Sep 5, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,950
total depth, ft
1
permits on file
Sep 5, 1997
last permit issued
Dec 4, 1997
completed
0
cumulative oil, bbl
139K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 4, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dauer G-14-167898Panhandle, West6A Production10139KDec 1997 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 932(-100%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1G. H. Ranch, Inc.Jan 1998 → Dec 2005
  2. 2G. H. Ranch Management, LLCJan 2006 → Sep 2012
  3. 3G. H. Ranch, LLCOct 2012 → Jan 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
465448-99DrillG. H. Ranch, Inc.Jul 25, 1997Sep 5, 1997Oct 28, 19972,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-167898————

Formation tops

As filed on W-2/G-1. Subsea from 3,272 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolo.2,681591

Perforations

Perforated and open-hole intervals.

FromToType
2,6812,790Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,21512.25600 S
5.52,8007.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 15, 1998Feb 17, 1998Yes
00May 11, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06532015, documented in the API reference.