WELL · 42-065-32069 · DISTRICT 10

Bischel #1R

Y

Carson County · Panhandle West field · Producing  · Vertical

Bischel #1R (API 42-065-32069) is a well in Carson County operated by Pantera Energy Company, completed July 12, 2001 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 18, 2001, permitted to 2,850 ft.

Completion filings report 2 formation tops, including Brown Dolomite, Granite Wash.

No lease production has been reported under this well’s leases.

Operator of record

Pantera Energy Company

Amarillo, TX · P-5 Y, filed Aug 4, 2025 · 359 permits on file · (806) 673-9438

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePantera Energy Company
Production reportsPantera Energy Companythrough Apr 2026
Latest permitPantera Energy CompanyMay 18, 2001
2,850
total depth, ft
1
permits on file
May 18, 2001
last permit issued
Jul 12, 2001
completed
0
cumulative oil, bbl
402K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 12, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bischel G-14-184411Panhandle, WestPantera Energy Company10402KJul 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 6,890 · prior 12 1,953(+253%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pantera Energy CompanyAug 2001 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
509189-99DrillPantera Energy CompanyMay 18, 2001May 18, 2001Jun 4, 20012,850

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-184411————

Formation tops

As filed on W-2/G-1. Subsea from 3,321 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite2,464857
Granite Wash2,721600

Perforations

Perforated and open-hole intervals.

FromToType
2,4802,554Perforated
2,5882,630Perforated
2,6622,700Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62552912.25255 S
5.52,8987.875120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 12, 2001Sep 4, 2001Yes
00Sep 25, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06532069, documented in the API reference.