WELL · 42-065-32079 · DISTRICT 10

Barnard #4R

Y

Carson County · Panhandle West field · Producing  · Vertical

Barnard #4R (API 42-065-32079) is a well in Carson County operated by Pantera Energy Company, completed June 15, 2003 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued March 13, 2003, permitted to 2,785 ft.

Completion filings report one formation top, including Brown Dolomite.

No lease production has been reported under this well’s leases.

Operator of record

Pantera Energy Company

Amarillo, TX · P-5 Y, filed Aug 4, 2025 · 359 permits on file · (806) 673-9438

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePantera Energy Company
Production reportsPantera Energy Companythrough Apr 2026
Latest permitPantera Energy CompanyMar 13, 2003
2,785
total depth, ft
1
permits on file
Mar 13, 2003
last permit issued
Jun 15, 2003
completed
0
cumulative oil, bbl
186K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 15, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barnard G-14-196453Panhandle, WestPantera Energy Company10186KJun 2003 – Jul 2026

Gas, mcf lease total

Last 12 months 5,453 · prior 12 5,111(+7%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pantera Energy CompanyAug 2003 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
529548-99DrillPantera Energy CompanyMar 13, 2003Mar 13, 2003May 16, 20032,785

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-196453————

Formation tops

As filed on W-2/G-1. Subsea from 3,313 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite2,540773

Perforations

Perforated and open-hole intervals.

FromToType
2,5482,564Perforated
2,5682,574Perforated
2,5802,586Perforated
2,5962,612Perforated
2,6222,640Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62556512.25285 S
5.52,8257.875120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 6, 2003Jul 7, 2003Yes
00Sep 12, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06532079, documented in the API reference.