WELL · 42-065-32088 · DISTRICT 10
Burnett -J- #D 98
Carson County · Panhandle Carson County Field field · NO Production · Vertical
Burnett -J- #D 98 (API 42-065-32088) is a well in Carson County operated by Granitebay Operating Inc., completed March 23, 2005 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued May 24, 2004, permitted to 3,420 ft.
Completion filings report 4 formation tops, including Panhandle Lime, Brown Dolomite, Arkosie Wash, Granite Wash.
Its lease has reported 155K barrels of oil and 1.37M mcf of gas since January 1993, last reporting in July 2026. The lease carries 23 wells, so these are lease totals, not this well alone.
Operator of record
Borger, TX · P-5 Y, filed Jul 4, 2026 · 5 permits on file · (806) 231-8205
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Granitebay Operating Inc. |
| Production reports | Granitebay Operating, Inc.through Apr 2021 |
| Latest permit | Granitebay Operating, Inc.May 24, 2004 |
- 3,420
- total depth, ft
- 2
- permits on file
- May 24, 2004
- last permit issued
- Mar 23, 2005
- completed
- 155K
- cumulative oil, bbl
- 1.37M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 23, 2005
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 23 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Burnett -J- O-14-1994 | Panhandle Carson County Field | Granitebay Operating, Inc. | 23 | 155K | 1.37M | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gross, L. Jack ProductionJan 1993 → Dec 1994
- 2Mistex Operating, Inc.Jan 1995 → Nov 1995
- 3BMX Corporation, Inc.Dec 1995 → Sep 2002
- 4Granitebay Operating, Inc.Oct 2002 → Feb 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 545973-98 | Drill | Granitebay Operating, Inc. | Mar 30, 2005 | May 24, 2004 | Oct 24, 2004 | 3,420 |
| 545973-99 | Drill | Granitebay Operating, Inc. | May 20, 2004 | May 24, 2004 | Oct 24, 2004 | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-1994 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,303 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Panhandle Lime | 1,928 | 1,375 |
| Brown Dolomite | 2,340 | 963 |
| Arkosie Wash | 2,949 | 354 |
| Granite Wash | 3,216 | 87 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,136 | 3,360 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 423 | 12.25 | 350 S |
| 5.5 | 3,419 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 29, 2005 | Apr 11, 2005 | Yes |
| 00 | May 24, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-065-32088 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-065-32088 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/06532088, documented in the API reference.