WELL · 42-065-32126 · DISTRICT 10
Sanford 160 #1R
Carson County · Panhandle West field · Producing · Vertical
Sanford 160 #1R (API 42-065-32126) is a well in Carson County operated by Borger Resources 2 LLC, completed January 14, 2012 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued November 10, 2011, permitted to 3,000 ft.
It was permitted by Snw Operating Company and has since transferred to Borger Resources 2 LLC on the wellbore schedule.
Completion filings report one formation top, including Brown Dolomite.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by SNW Operating Company; the EWA schedule now lists a different operator.
Borger, TX · P-5 Y, filed Jan 4, 2026 · 1 permits on file · (214) 336-6692
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Borger Resources 2 LLC |
| Production reports | Borger Resources 2 LLCthrough Apr 2026 |
| Latest permit | SNW Operating CompanyNov 10, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,000
- total depth, ft
- 1
- permits on file
- Nov 10, 2011
- last permit issued
- Jan 14, 2012
- completed
- 0
- cumulative oil, bbl
- 138K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 14, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sanford 160 G-14-267590 | Panhandle, West | Borger Resources 2 LLC | 1 | 0 | 138K | Jan 2012 – Jul 2026 |
Gas, mcf lease total
Last 12 months 6,205 · prior 12 7,235(-14%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1SNW Operating CompanyMar 2012 → Sep 2014
- 2PG-M International Operating,llcOct 2014 → Jun 2019
- 3Bar L ProducersJul 2019 → Mar 2023
- 4Borger Resources 2 LLCApr 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 724037-99 | Drill | SNW Operating Company | Sep 12, 2011 | Nov 10, 2011 | Jan 9, 2012 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-267590 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,275 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,372 | 903 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,330 | 2,882 | Perforated |
| 2,330 | 2,882 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 421 | 13.5 | 250 S |
| 7 | 2,356 | 8.75 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 5, 2013 | May 8, 2013 | — |
| 00 | May 8, 2013 | Apr 26, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-065-32126 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-065-32126 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/06532126, documented in the API reference.