WELL · 42-067-30293 · DISTRICT 6
Mac Donnell -B- #1
Cass County · Frost (Smackover) field · Shut IN · Vertical
Mac Donnell -B- #1 (API 42-067-30293) is a well in Cass County operated by Valence Operating Company, completed December 19, 2023 and listed as shut in on the RRC schedule.
The RRC has issued 2 drilling permits between 1978 and 1987, permitted to 10,000 ft.
It was permitted by Post Petroleum Company, Inc and has since transferred to Valence Operating Company on the wellbore schedule.
Completion filings report 6 formation tops, including Goodland, Paluxy, James Lime, Travis Peak.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit.
Operator of record
Permitted by Post Petroleum Company, Inc; the EWA schedule now lists a different operator.
Kingwood, TX · P-5 Y, filed Apr 4, 2026 · 990 permits on file · (281) 359-3659
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Valence Operating Company |
| Production reports | none |
| Latest permit | Post Petroleum Company, IncSep 18, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 2
- permits on file
- Sep 18, 1987
- last permit issued
- Dec 19, 2023
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 19, 2023
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mac Donnell -B- O-6-10198 | Frost (Smackover) | Valence Operating Company | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 333860-99 | Recompletion | Post Petroleum Company, Inc | Jul 31, 1987 | Sep 18, 1987 | — | 10,000 |
| 21701-99 | Drill | Braun, C F & Co. | Apr 10, 1978 | Apr 10, 1978 | Aug 2, 1978 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-10198 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 277 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Goodland | 3,990 | -3,713 |
| Paluxy | 4,240 | -3,963 |
| James Lime | 6,370 | -6,093 |
| Travis Peak | 6,550 | -6,273 |
| Cotton Valley | 7,894 | -7,617 |
| Smackover | 9,832 | -9,555 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,506 | 4,592 | Perforated |
| 4,506 | 4,596 | Perforated |
| 9,863 | 9,876 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,637 | 12.25 | 1,175 S |
| 2.375 | 9,667 | — | — |
| 5.5 | 9,993 | 8.75 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 18, 2024 | Jan 18, 2024 | — |
| 00 | Jul 25, 1996 | Feb 5, 1996 | — |
| 00 | Jul 6, 1988 | May 31, 1988 | — |
| 00 | Jan 12, 1984 | Dec 3, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-067-30293 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-067-30293 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 82.2K
- bbl, all reported
- May 2026
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000081900 | H-1 Injection | Active | 5,000 | 1,350 | 2,700–9,700 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/06730293, documented in the API reference.