WELL · 42-067-30332 · DISTRICT 6

Oakland Corp #115

N

Cass County · Kildare (Cotton Valley) field  · Vertical

Oakland Corp #115 (API 42-067-30332) is a well in Cass County operated by Killingsworth Oil CO., completed August 9, 1988.

The RRC has issued 2 drilling permits between 1980 and 1989, permitted to 10,400 ft.

Completion filings report 10 formation tops, including Massive Anhy, Massive Anhydrite (marker), Base Massive, Hill Lime.

Its 2 leases have reported 335K barrels of oil and 8.34K mcf of gas since January 1993, last reporting in July 2026. The leases carry 20 wells, so these are lease totals, not this well alone.

Operator of record

Killingsworth Oil Co.

Longview, TX · P-5 Y, filed Mar 4, 2026 · 18 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKillingsworth Oil Co.
Production reportsMoransco Energy Corporationthrough Feb 2026
Latest permitKillingsworth Oil Co.Nov 21, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,400
total depth, ft
2
permits on file
Nov 21, 1989
last permit issued
Aug 9, 1988
completed
335K
cumulative oil, bbl
8.34K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 9, 1988
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 20 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Oakland Corp. Waterflood Unit O-6-12302KildareMoransco Energy Corporation20335K8.34KJan 1993 – Jul 2026
— G-6-91205——000—

Oil, barrels lease total

Last 12 months 8 · prior 12 15(-47%)

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Killingsworth Oil Co.Jan 1993 → Apr 1994
  2. 2McKnight, C. L. Oil Co. LLPMay 1994 → Jun 1998
  3. 3Mill Creek Oil Co.Jul 1998 → Aug 2007
  4. 4Rodessa Operating CompanySep 2007 → Dec 2012
  5. 5Black Bayou Operating, LLCJan 2013 → Nov 2019
  6. 6Moransco Energy CorporationDec 2019 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
366578-99RecompletionKillingsworth Oil Co.Nov 16, 1989Nov 21, 1989—10,200
94510-99DrillHilliard Oil & Gas, Inc.Sep 29, 1980Sep 29, 1980Oct 1, 198010,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-91205————
—— O-6-12302————

Formation tops

As filed on W-2/G-1. Subsea from 11 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhy5,580-5,569
Massive Anhydrite (marker)TOP MASSIVE ANHYDRITE5,580-5,569
Base Massive5,842-5,831
Hill Lime5,952-5,941
Gloyd Lime6,068-6,057
Top Gloyd Lime6,068-6,057
Dees Lime6,210-6,199
Top Dees Lime6,210-6,199
Top Young Lime6,244-6,233
Young Lime6,244-6,233

Perforations

Perforated and open-hole intervals.

FromToType
6,0686,072Perforated
9,7609,776Perforated
9,8089,840Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,51011745 S
2.3759,708——
5.510,2007.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 27, 2021Aug 10, 2021—
00Apr 27, 1990Jan 19, 1990Yes
00Apr 10, 1990——
00Jan 19, 1989Dec 9, 1988Yes
00Jan 12, 1984Jan 2, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06730332, documented in the API reference.