WELL · 42-067-30446 · DISTRICT 6

Gipson #1

Plugged

Cass County · Walker (Travis Peak) field  · Vertical

Gipson #1 (API 42-067-30446) is a plugged well in Cass County, plugged September 10, 2014, last operated by Crystal Oil Company.

The RRC has issued 3 drilling permits between 1983 and 1992, permitted to 7,100 ft.

Completion filings report 8 formation tops, including B/Annona, Buckrange, T/Massive, B/Massive.

Operator of record

Crystal Oil Company

Shreveport, LA · P-5 Y, filed Dec 4, 1998 · 56 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCrystal Oil Company
Production reportsChaparral Energy, L.L.C.through Sep 2007
Latest permitCrystal Oil CompanyOct 19, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,100
total depth, ft
3
permits on file
Oct 19, 1992
last permit issued
Mar 22, 1986
completed
0
cumulative oil, bbl
259K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 22, 1986
Shut in
—
Plugged
Sep 10, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gipson G-6-142983Rodessa (Hill 5800)Chaparral Energy, L.L.C.10259KJan 1993 – Mar 2015
Gipson O-6-11507Walker (Travis Peak)Crystal Oil Company100Jan 1993 – Jan 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crystal Oil CompanyJan 1993 → Dec 1994
  2. 2Apache CorporationJan 1995 → Nov 1997
  3. 3Bristol Resources CorporationDec 1997 → Jan 2000
  4. 4Chaparral (USA) Energy, Inc.Oct 2000 → Sep 2002
  5. 5Chaparral Energy, L.L.C.Oct 2002 → Sep 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
404856-99RecompletionCrystal Oil CompanyOct 19, 1992Oct 19, 1992Oct 19, 19927,100
300169-99OtherCrystal Oil and Land Co.Mar 20, 1986Mar 24, 1986—7,100
219689-99DrillCrystal Oil and Land Co.May 24, 1984Nov 2, 1983—7,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-142983————
—— O-6-11507————

Formation tops

As filed on W-2/G-1. Subsea from 290 ft elevation.Download CSV →

FormationMD ftSubsea
B/Annona2,705-2,415
Buckrange2,800-2,510
T/Massive5,275-4,985
B/Massive5,495-5,205
Pettit6,330-6,040
T/Sligo6,330-6,040
Travis Peak6,520-6,230
T/Travis Peak6,520-6,230

Perforations

Perforated and open-hole intervals.

FromToType
5,6385,642Perforated
5,6525,655Perforated
5,7575,765Perforated
5,7765,778Perforated
5,7835,786Perforated
5,7885,792Perforated
5,8985,904Perforated
5,9145,916Perforated
5,9295,938Perforated
5,9415,945Perforated
6,4546,457Perforated
6,4606,464Perforated
6,4746,480Perforated
6,5686,574Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,01712.25495 S
5.57,1007.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 28, 1992Nov 12, 1992Yes
00Dec 3, 1992——
00Jan 13, 1987Apr 11, 1986—
00Nov 15, 1984Oct 22, 1984—
00Nov 9, 1984——
00Feb 2, 1984Dec 28, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06730446, documented in the API reference.