WELL · 42-067-30520 · DISTRICT 6

Allday "A" #1

Plugged

Cass County  · Vertical

Allday "A" #1 (API 42-067-30520) is a plugged well in Cass County, plugged July 10, 1985, last operated by Diamond A Inc..

The RRC has issued 2 drilling permits (amended once) between 1985 and 1993, permitted to 6,500 ft.

Completion filings report 2 formation tops, including Nacatoch, Goodland.

Its lease has reported 442K barrels of oil and 119K mcf of gas since July 1993, last reporting in July 2026. The lease carries 28 wells, so these are lease totals, not this well alone.

Operator of record

Diamond a Inc.

Tulsa, OK · P-5 Y, filed Sep 6, 1996 · 8 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsWilson Energy Resources LLCthrough Feb 2026
Latest permitDiamond a Inc.Jul 6, 1993
6,500
total depth, ft
3
permits on file
Jul 6, 1993
last permit issued
—
completed
442K
cumulative oil, bbl
119K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jul 10, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 28 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hosey-Driskell Unit O-6-13177Hosey-Driskell (Rodessa)Wilson Energy Resources LLC28442K119KJul 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 36 · prior 12 274(-87%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Diamond a Inc.Jul 1993 → Dec 1994
  2. 2Diamond Energy Operating CompanyJan 1995 → Aug 1998
  3. 3Belco Energy Corp.Sep 1998 → Oct 1998
  4. 4Southwest Operating, Inc.-TylerNov 1998 → Dec 1999
  5. 5Goldsberry Operating Co., Inc.Jan 2000 → May 2000
  6. 6Chaparral Operating, Inc.Jun 2000 → Sep 2001
  7. 7Williamson Operating Co., LLCOct 2001 → Mar 2005
  8. 8Loutex Production CompanyApr 2005 → Jun 2008
  9. 9GMX Resources Inc.Aug 2008 → Mar 2014
  10. 10Thunderbird (Texas) Resources LPApr 2014 → Sep 2017
  11. 11Tanos Exploration II, LLCOct 2017 → Jul 2021
  12. 12Diversified Production LLCAug 2021 → Sep 2022
  13. 13Wilson Energy Resources LLCSep 2023 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
413531-98ReenterDiamond a Inc.Feb 3, 1994Jul 6, 1993Feb 5, 19944,000
413531-99ReenterDiamond a Inc.Jul 6, 1993Jul 6, 1993—2,200
278326-99DrillPitts Oil Co.-Dallas Prod. Inc.Jun 20, 1985Jun 20, 1985—6,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-13177————

Formation tops

As filed on W-2/G-1. Subsea from 352 ft elevation.Download CSV →

FormationMD ftSubsea
NacatochNACATOCH SAND1,750-1,398
GoodlandGOODLAND SAND3,650-3,298

Perforations

Perforated and open-hole intervals.

FromToType
1,8001,860Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,48212.25771 S
73,4247.875120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 31, 1994Mar 21, 1994Yes
00Aug 8, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000094445H-1 InjectionPlugged Oct 3, 20195,0008001,700–3,700

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/06730520, documented in the API reference.